A-a b ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L
UNITED STATES ATOMIC ENERGY COMMISSION WASHINGTON, D.C.
20545 J"ly 19, 1968 Honorable Glent T. Seaborg Chairman U. S. Atomic Energy Commission Washington, D. C.
20545
Subject:
REPORT ON RANCHO SECO NUCLEAR GENERATING STATION, UNIT NO.1
Dear Dr. Seaborg:
During its ninety-ninth meeting, July 11-13, 1968, the Advisory Committee on Reactor Safeguards reviewed the proposal of the Sacramento Municipal Utility District to construct the Rancho Seco Nuclear Generating Station, Unit No. 1.
This project had been considered previously during Subcom-mittee meetings on April 23, 1968, at the site, and on June 28, 1968, in Washington, D. C.
In the course of its review, the Cormittee had the benefit of discussions with representatives and cons
. ants of the Sacra-mento Municipal Utility District, the Babcock and wttcox Company, Bechtel Corporation, and the AEC Regulatory Staf f.
The Committee also had avail-able the documents listed below.
This 2452 MWt pressurized water reactor will be located about 25 miles southeast of Sacramento, Califotnia, in a sparsely populated area.
This region of California is seismically relatively inactive; the largest earthquake of historic record in the vicinity of the site is of Intensity VI, Modified Mercalli (MM) scale. The applicant has agreed to design for saft
?,utdown following an earthquake during which the maximum horizontal acccieration is 0.25 g (MM VIII), and the design will allow continued operation for an earthquake of about one-half of this acceleration. He plans to install a strong motion accelerograph.
All water needs for this plant will be supplied from the Folsom South Canal, which will pass within five miles of the site.
Should completion of this canal be delayed, a separate pipeline from Lake Natoma, about 20 miles north of the site will be constructed. An on-site reservoir will have a capacity of 2500 acre-feet, sufficient for about 35 full power days of operation, and waste heat will be discharged to the atmosphere
'(.
through use of cooling towers. The plant is unique in that the appli-cant proposes not to discharge liquid wastes to the environment. The applicant is studying methods to cope with possible build-up of tritiam in the reactor coolant water.
i f
8001170 M
,.,j t..
e, s
-u y.
01'h[I)'/
QDiau d Honorable Glenn T. Seaborg July 19,1968 L
The applicant has proposed using signals from the protection system for The Committee reiterates its belief control and protection purposes.
that control and protection instrumentation should be as nearly indepen-dent of common failure modes as possible, so that the protection will not be impaired by the same failure that initiates a transient requiring protection. The applicant and the AEC Regulatory Staff should review the the possi-proposed design for common failure modes, taking into acccunt failures of redundant de-bility of systematic, non-random, concurrent In cases where vices, not considered in the single-failure criterion.
hypothesized control or override failure could Icad to the need for ac-tion by interconnected protection instrumentation, separate protection instrumentation channels should be prov,ided or some other design approach used to provide equivalent safety.
The Committee suggests that, in view of possible uncertainties in current predictive techniques, further analyses be made of the anticipated inte-grated fast flux at the prescure vessel wall, and that the adequacy of the proposed pressure vessel material surveillance program be resolved between the applicant and the Regulatory Staff during construction of the station.
This reactor is similar to others designed by this vendor and reviewed previously (see, for example, the ACRS report on the Crystal River plant, May 15, 1968). The Committee continues to call attention to matters that warrant careful consideration by the manufacturers of all large, water-cooled, power reactors. These matters, referred to in the above-mentioned report, apply similarly to the Rancho Seco project.
The Advisory Committee on Reactor Safeguards believes that the items noted above can be resolved during construction, and that the proposed plant can be built at the rancho Seco site with reasonable assurance that it can be operated without undue risk to the health and safety of the public.
Sincerely yours,
/s/
Cstroll W. Zabel Chairmen References attached.
'(.
l h
a r
A
9
,c a.
3-July 19, 1968 Honora~ule Glenn T. Seaborg L
4 References - Rancho Seco 1.
License Application for Construction Permit, Sacramento Municinal Utility District, dated November,1967; Volumes I, II, III, IV of the Preliminary Safety Analysis Report for Rancho Seco Nuclec:
-Generating Station,-Unit No. 1 2
Sacramento Municipal Utility District; Amendment No. 1, dated February 2, 1968 3.
Sacramento Municipal Utility District; Amendment No. 2, dated April 15,1968 4.