ADVI.ORY COMMITTEC ON REAbTCR SAFEGUARDS NUCLEAll HCGUL ATOliY CGM?MSION
'S WASHlf;G10fJ, D. C. */0055 i.
July 16, 1975 Honorable Ililliam A. Anders Chainna U. h. Muclear Ecculatory Corsaission Washi13 ton, D. C. 20355
Subject:
REPORT Cli RANCHO SECO liUCLEAR CEUERATINC STATIO:1, UNIT 1
Dear l'r. Anders:
Durirg its 103rd ractirr,, July 10-12, 1975, the Advisory Comittee on Reacter Safo;uards revic red the proposal of the Sacramento Municipal Utility District to increase the pouer Icycl of the Rancho Seco 1:uc10ar Generatirg Station, Unit 1, froa 2568 M'l(t) to 2T/2 I;!(t). This proposal uas also considered at a SubccI-mittee noctirg in Washington, D. -C.
on June 211, 1975.
In the courso of its review, the Cortittee had the benefit of discussions with representatives and consultants of the Sacre:r.cnto liunicipal Utility District, the Babcock and Hilcox Company (B&W), and the NRC StatT, and of the documents listed.
The Cc:raittae last reported on the operation of this plant in its letter of Septonbcr 11, 1973 At that time, the Co=aittee recom-mondcd that three conditions be satisfied before the plant uas permitted to operate at its desiSn poner level of 2772 IO!(t).
Operation of Unit 1 of the Oconce Nuclear Station, the a.
prototypa for ibncho Seco Unit 1, should be revicued and found satisfactory by the Rc;ulatory Staff.
b.
Operatien of Rancho Seco Unit 1 at 2568 ff.l(t) should be revicwed by the Ho;ulatory Staff and the ACES and detemined to be naticractory.
c.
The Rq;ulator/ Staff cheuld perfom an independent confir. nation of tha licennec'c linear heat r;cneration rates, operatin; limitu md ECCS efficacy, nnr1 chould cubnit a i
l supple"!cntal Safety Evaluation Report.
gpg h
D BMh b l l
Theco three conditionu have been natinfied.
8001170 D g P
\\
Ilonorabic !!illiam A. Anders July 16, 1975 The cpplicant is usin; control of the boron concentration in the core coolin; uater an an aid for reactivity control durirg pouer man:uverin;.
Durin; the pact several r.:onths, plant operatora hnve applic<l this cyatem in a variety of pouer Operatin; caperience with the system to date has maneuverc.
been acceptable.
The Advicory Comaittee on Reactor Sarcguards believes that, if duo re;ard is given to those itema ncntioned in its report of September 11, 1973, there is reasoncbic accurance that Rancho Seco !!uelcar Gencratin; Station, Unit 1, can be cperated at design pouce (2772 ICl(t)) without undue risk to the health and d
safety of tha public.
Sincerely yours, N h /' M V. Kcer Gnairman m
Referencas:
1.
Supplement !!o.1 to the Safety Evaluation by the Directorate of Licenslig, U. S. Atomic Enon;y Cora.niscion in the matter of Sacramento Ilunicipal Utility Dictrict, Rancho Seco Iluclear Generatirn Station, Unit Ilo.1, Docket flo. 50-312, Ilov. 28,1973 2.
Supplement !!o. 2 to the Safety Evaluation by the Office of fluclear Reactor Rc;ulation, U. S. !!uclear Re3ulatory Commission in the matter of Sacramonto l'inicipal Utility District, Rancho Seco IIuclear Generatirc Station Unit tio.1, Docket No. 50-312, June 10, 1975.
3 Safety Evaluation Rcport by the Directorate of Licensirn, U. S.
- Atomic Enon;y Commincion in tha matto-of Sacra:acnto liunicipal Utility Dintrict, Rancho Seco !!uclear Generatitu Station Unit No.1, Docket !!o. 50-312, Dece:aber 27, 1974.
4.
Letter from E. K. Davis, General tiana:cr, Sacramento Municipal Utility District of liarch 12, 1975 to tir. Arv,clo Giambusco, Director, Divinion of IIcactor Licencien, liitC, Re:
!!HC Docket 11o. 50--312, Propeced Technical Specification Charuc No.1, Hancho Seco !!ualcar Concratirg Station, Unit ilo.1.
s