Confirms Corrective Action Required Re 770924 Depressurization Event at Davis-Besse 1 Per 770929 Telcon W/Util
ML19322C448
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 09/30/1977
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
References
TASK-TF, TASK-TMR NUDOCS 8001170617
Download: ML19322C448 (2)


Text

,

Y j

SEP 3 01977 i

l Docket Fo. 50-346 l

Toledo Edison Company ATIN:

Mr. James S. Grant

@g$ ggg Vice President - Energy Supply

$dPT M,19If.

Edison Plaza 300 Madison Avenue Toledo, OH 43652 Centleuent

~, _.

- ~

s This. refers. to the'. telephone eenversations;between you andeMr. Evans) r jof i sepyour staff and Hesero. Fiore111' and Knop 1of this officejoa~regardingfcor

~"~

tember 29, 1977, "the~ depre'ssurizapion, event. occurring ~at' th'e Davis-Besse Unit 1

~

FuclearPlantoniSept, ember,24,;1977.;

As discussed during our conversation with you on September 29, 1977, we understand that you wiil 1.

Evaluate the actuation of the steam, feedwater rupture control 5 ystem and. determine what corrective actions must be taken to s

improve reliabilityjof this system during future operation.

5 EOsliste"t5e cooldowd of the primary system and determine that 2.

' resultiing 'stressei'i the piping and/or vessels were within n

acceptable limits.

,,,-.n,

.w ~.

3.

Evoluete 'the press,ere escursi,on:in the primary system to determine that th's transient,iincluding boiling.effsets, did not[cause; 7; damage toLthe ' primary systemi to the reactor vessel or it's i

l internal Fonhonent's'or"to the reactor fuel.

^

i y-

.. ~ _.,,,

4.

1 Determine why theistiaas generator wee esptied, and evaluate the i

short and long-tea effects of the transi.ent.on steam generator 2 to determine tt at there iteranno ezeesolve,etresse.ejcaused by j

primary to secondary pressure differential, thermal shock or by allowing the stessi generatorJ.o go dry.

,{"'

/-?"

-,qs.

- - t 6.y.

y-y.g,.

-5.

, Review. ell,available, data and; determine what equipment 'did moti f

tfee'ettee eefdeelsmed. For equipment so identified,' deidraine the cause of the failure and steps to preclude future failure.

J M k 1t I

d@

.oor n, mm i nu : c-n o er.~.t 4i.

' rrecu p.

o

.unwau s t-r

'j I

mars t-

'?

I W u. a. oovsanuswr enownw. orrscs. ser.-.aus4 NRC PORM 31s (9-76) NRCM 0240 r

t*%

8001170 J

J~

9 Toledo Edison Co. par.y SEP 3 0197T i

6.

Feep Region III office informed in a timely c:anner as s11 the t

reviews and corrective actions are being accomplished so that we can evaluate the effectiveneas of your corrective actions.

{

Ve understand that the above vill be completed prior to the plant i

going into Mode 4 (Hot shutdown) nparation.

l i'

Plestie inform us inmediately if your understanding of these items j

is different from that stated above.

l

,j l

sincerely, 1

I James C. Keppler e

Director e

l cct Mr. J. Evans, Station Superintendent

~

1 Central Files

- j Reproduction Unit NRC 20b PDR t

Local PDR NSIC TIC D. Young Park, Power Siting Company V. P. Ellis, FC&EB, IE Lana Cobb, Plans and Analyses. IE 1

IMM,EDIATE ACTION LET'En RlII k,, r.c s *

, RIII RIII f.

Knop /1sh. Fiore11i Ke er 9/29/77 3

I NaC PORM SIS (M6) NRCM s240

  • ci s. eovannwsur enwrme orrecs, teve-sae.ese i