Text
pc,7 J.O 1 3.3 Files THRU:
Y. A. Moore, C*;ief. Electrical Systems Branch, DES MKETING WITH DUEE F0WER COMPANY CN OCONEE NUCLEAR STATIOM, DOCIETNOS.Sp269,50-270,and50-287 A meeting was held with Duka Power Company on April 2, 1970, to discuss the instrumentatica and power systems schematic drawings for the Oconee Nuclear Station. An attendanca list is attached.
In addition to an explanation of " normal" circuit operation, test procedures for the Reactor Protection System and Engineered Safe-guards were explained. Other items discussed concerned areas where the schematics appeared to be incorrect, disagreed with the information in the FSAR, or the design appeared not to meet IEEE 279 criteria.
Since the schematic errors were confirmed to be only draf ting errors, the applicant was informed that corrected drawings need not be submitted.
Details of the discussions are given below.
Items which require further evaluation or documentation are identified by an asterisk.
0ff-site Power 1.
In accordance with the applicant's station, rather than unit, operation concept, controls for the 230 kV and 500 kY switch-yard breakers are located in the Unit 1 - Unit 2 control room.
The Unit 3 operator has direct control of only those breakers needed to synchronize Unit 3 to the off-site power system.
Information regarding switchyard condition is provided by status lights in the Unit 3 control room.
2.
.:.1though the three gas turbines at the Lee Steam Station can. sot i
be started from Oconee, the controls necessary to separate t.e 100 kV transmission line from the 100 kV system are provided in the Unit 1 - Unit 2 control room. A naximum time of 15 minutes is required to provide power to Oconee from the gas turbines.
On-site Fever 1.
The applicant described the automatic breaker sequence upon unit trip. This sequence is applicable to each unit.
OmCE >
SURNAME >
DATE >
Form AEC-318 (Rev. 9-53) AECM 0240 e s. sovranosur peinnne orma i osa o-see.sn 3912200 Jag
oconee 2
M?t 16 1970
/
a.
If the 230 kV system is available, the reactor' coolant pump buses and the main feeder buses are transferred to the start-up transformer.
b.
If the 230 kV system is unavailable and an accident signal is present, the main feeder buses receive power from one preselected hydro unit via the 13 kV underground feeder and the standby buses.
c.
If the underground feeder path is unavailable, the other hydro unit will automatically supply power to the main feeder buses via the 230 kT switchyard and the start-up transformer.
Prior to the meeting, I had interpreted the FSAR description to mean that the transfer to the second hydro unit was a manual rather than automatic operation.
Since this is a significant feature of the power system design, the applicant agreed to review the FSAR to determine if the existing description is adequate.
2.
Regardless of the source, all a-c power to the main feeder buses of Units 1 and 2 is routed through the BIT and 32T switchgear.
Power from the standby buses to Unit 3 main feeder buses also passes througa this switchgear. The applicant stated that this switchgear is located in a Class I room, the redundant sections are separated by a distance of ten feet, no other equipment is located in the room and no automatic fire protection is provided.
3.
Page 8-10 of the FSAR states that any unit can supply power to another through the standby buses. The applicant stated that the switching to accomplish this is under manual control.
4.
Equipment installation prict to the operation of Unit 2 and 3 was discussed.
a.
The start-up transformers will go into operation with their associated unit.
b.
The 230 and 500 kV system will be interconnected when Unit 3
)
begins operation.
c.
Unit 2125 Vdc system will 30 into cperation with Unit 1.
Similarly, Unit 3 125 Vdc system will go into operation with Unit 2.
OFTICE >
SURNAME >
DATE >
l forma AEC-318 (Rev. 9-53) AECM 0240 m.s. novsmassat mense omes i nse o-see-on
Oconee 3
APF. I 6 TO 5.
Both hydro units are automatically started by a fault in the 230 kV system or an accident signal in any Oconse unit. Duka drawings OEE-120 and OEE-120-1 were clarified.
Each Knowee unit has two redundant start channels, one from Units 1 and 2 and the other from Unit 3.
Manual start switches for each hydro are provided in each Oconee control room.
- 6.
Each of the redurdant 600 Y and 208 Y McC's which supply power to E37 components has two feeders. The applicant was requested to confirm and document in the FSAR that no automatic switching of the power supplies to these load centers is providad.
- 7.
Long term availability of the Keowee units was discussed.
We stated that the reservoir level was a matter to be discussed during the technical specification meetings.
- 8.
The 125 Yde Instrumentation and control Power System of each unit includes four distribution panels.
Each panel receives power via isolating transfer diodes from either of two batteries, one battery in the associated unit and the other in a different unit.
a.
Each of the sixteen diodes of a particular panel is rated at twice the full load current and approximately 1200 volts reverse voltage.
b.
Within each diode bank, the diodes associated with one battery are separated by a metal sheet from those associated with the other battery.
c.
Each diodo bank is monitored by a system of proprietary design which can detect an open er shorted diode. Alarms in the control room identify the faulty bank; local lights identify the particular diode.
d.
The ground detection system is designed only to detect grounds on the battery side of the diodes.
The applicant was informed that, since prompt detection of failures is a significant factor to be considered in evaluating the system design, we may request detailed information regarding the diode monitoring system and the ground detection system.
- 9.
Page 8-7 of the FSAR states that the 125 Yde batteries are sized to carry the continuous emergency load for one hour. The appli-cant stated that this time could be extended by reducing the unnecessary loads, e.g.,
the ICS and the computer. We requested that the ann 1(emne claviFw the FitA R en reF1mee this recinead power / extended time capability.
m, SURfeAME >
DATE >
Form AECats (Rev.943) AECM 0240 u.t sonnensur enestins omca : seu o-ase-eer I
i I
. _.... -_._. ~ _.,,. _ _. _.
Oconee 4
APR I 3 mm
- 10.
The applicant agreed to revise FSAR Figure 8-5 to eliminate the
" Control & Instr. Unit 2" load on panel IDIC and the "Eng. Sfsds.
~
Actuation System 3A" load on bus IKVID which are incorrect.
11.
The applicant stated that there are no 250 Vdc loads which are required for safety.
Revision 3 to the FSAR deleted the reference to the pump circuit breakers in describing the Power / Pump reactor trip. The applicant stated that the circuit retains the pump breaker contacts but a power sensing circuit has been added.
2.
We questioned the applicant regarding the justification for bypass-ing the Power / Pump, Power / Flow, and Pressure / Temperature trips j
with the shutdown bypass switch. Thespplicant stated that since these trips did not add to the protection of the reactor while in the shutdown condition they are bypassed regardless of whether 1
they are in the tripped mode or not.
3.
The applicant explained the administrative controls applicable to the Channel Bypass Switch. Only one key is readily available for use and it cannot be resaved from the switch while in the bypass position. Administrative controls require that the channel be placed in the tripped mode prior to being bypassed. The applicant intends to bypass the channel during periodic testing to reduce
)
the possibility of spurious reactor trip.
During this time, the 1
reactor protection trip logic will be 2/3.
4.
Page 7-1 of the FSAR states that the RPS is designed to meet the single failure criterion of IEEE 279.
The applicant stated that the phrase "no single component failure" was not intended to modify the interpretation of IEEE 279 and could be interpreted as "no single failure."
- 5.
Table 7-1 and Technical specification 15.2.3 of the FSAR disagree regarding the Power / Pump reactor trip set points.
The applicant stated that no attempt has been made to keep the technical speci-fications in agreement with the remainder of the FSAR pending future meetings on technical specification. The applicant stated I
that Table 7-1 is correct.
- 6.
FSAR Page 4-1 states that " Operation on a single loop will require unit shutdown and adjustment of high reactor outlet temperature trip settings." We stated that this procedure did not meet our l
internretation of Section 4.15. Multiple Set Points. of IEEE 279.
meeting theyl-did not navrthe"righi, i.uchnical yeoph r. wee-toInrespons l
s answer questions in this area.
We agreed to postpces discussiott
$URNAME >
DATE >
Forin AEC-Ste (Rev. 9-53) AECM 0240 a s. oonanmenv eeinvine arrica s i es o-ase-eiv l
1
+-v-m.
.w e
pw---,,i e
e
7 R. Pollas
@ Suppl.
.m DRS Randing oconee 5
WI6 g
- 7.
The FSAR states that the reactor trip channels will be tested every four weeks, but the reactor trip breakers, and their asso-ciated logic, will be tested only every 20 weeka. Upon question-l ing, the applicant stated that the reactor trip breakers would not endure monthly trip testing.
Since the provision for breaker testing is incorporated in the system design, we stated that a discussion of the testing frequency could be postponed.
Engineered Safety Features
- 1.
The applicant stated that FSAR Figu;e 7-3 is incorrect and will be revised. We pointed out that to agree with the advance copy of the revised figure (received at the November, 1969, meeting) other FSAR revisions are needed, e.g., Page 7-13 and Figure 6-3.
- 2.
Duke drawings ORE 158-1,
-3, and -6 indicate that the station stack radiation monitor interlock has been deleted from some reactor building purge isolation valves. We pointed out that the interlock on the remaining valves does not meet the single failure criterion. The applicant stated that this interlock is not required for safety. We will need to obtain confirmation of this statement from DEL, but Figure 6-5 will need revision in any case.
3.
We noted that several de powered containment isolation pilot sole-noid valves must energise to close. When questioned about the lack of " fail-safe" design, the applicant stated that the normal position of the velve was chosen to be the de-energized positica regardless of the accident position.
Since redundant se operated valves are provided, we agreed that the design is acceptable.
- 4.
The test procedure for the engineered safety feature instrumenta-tion was oxylained. In general, the instrumentation is designed to be tested in parts which overlap so that the entira circuit from sensor to actuated component can be tested. No additional information is needed at this time but my evaluation of the circuits' testability is continuing based on information received at the meeting.
/j C/
- 1. D. Follard R55-15 Electrical Systems Branch DRS:ESB:IDF Division of Ecactor Standards Inclosure:
List of Attendees omcric w/ench
....DRS.:ISA.
J E. G. Case, DRS 0.D. Parr, DEL M
- 1 I# '
- 5""f. t---Dufoung i--DPL-eki.i. e -.
omG. G...Lang... DEL..L.....
41./.A./10....
4 //l.12.Q Forum AEC-318 iRev. 9-53) AECM 0240 e.s. eavesmoser pawnes amca issa o-a.s.nv
l E'i 1 i G70 LIST OF ATTENDEES
- DUKE POWER COMPANY 1EETDIG 1
APRE 2, 1970 6Tc9.
A. Schwencer (part time)
T. Ippolito R. Pollard C. Murphy Duke Power Paul H. 3arton Bill Poley Bill Rice K. S. Canady O. S. Bradham C. A. Price J. S. Davia Wu. Parker, C. J. Wylic R. A. Waltman L. E. Susumarlin Babeeck & Wilcox W. 1. Smith
- 3. S. Patterson H. H. Stevens
- 1. Y. Straub
- 1. Craig (excused 4arly) 3aileY Meter Company C. A. McGunnigle J. C. McCreary D. E. Wurstar
- Duke Power, 3abcock & Wilcox, and Bailey Mater perscenal were excused as discussion of their area of expertise was completed.
_ -. _..