a APPENDIX A

(

NOTICE OF VIOLATION Based on the results of an inspection conducted on May 12-13, 1977, it appears that certain of your activities were not conducted in full compliance with conditions of your NRC Facility Licenses Nos. DPR-38, DPR-47 and DPR-55 as indicated below.

Item A is an Infraction and Item B is a Deficiency.

A.

Technical Specification 6.4.1 requires that the station shall be operated and maintained in accordance with approved procedures.

Contrary to the above, flushing of the secondary side of the steam generator 1B was stopped and the steam generator was filled on May 10, 1977, and leak tested on May 11, 1977, although the secondary side contamination levels were not low enough to allow draining to the hotwell as required by procedure OP/0/A/1106/30, and as determined by Enclosure 4 to procedure CP/0/B/100/2.

B.

Paragraph 19.11 of 10 CFR 19 requires in part tlat the licensee post, within 2 working days of receipt or dispatch, copies of any notice of violation involving radiological working conditions, any notice or proposed Imposition of civil penalty, and the licensee's response to such notices.

Contrary to the above, as of May 12, 1977, the licensee had not

~

posted copies of:

the notice of violation involving radiological working conditions contained in IE Inspection Report No. 50-269/77-3, which was received at the site on April 15, 1977; the notice of proposed imposition of civil penalties dated March 29, 1977; and the licensee's responses to these notices which were dispatched on May 2, 1977 and April 20, 1977, respectively.

7912050 k

-