ML19322B590

From kanterella
Jump to navigation Jump to search
Responds to IE Insp Repts 50-269/75-10,50-270/75-11 & 50-287/75-11.Notifies That Operating Personnel Training Course Due to Commence 760115 & Finish 760212
ML19322B590
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/13/1976
From: Parker W
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7912040618
Download: ML19322B590 (1)


Text

,

Dunn POWER COMPANY Powru Uuittnwo 4ee Socin Cuuncu STuncT. CuantoTTE, N. C. cua w WILLI AM 0, P A R et E R,.J Fe.

aO%c: AnEA 704 ViC E Fre r $'Ot N' eggf07 37.3 aoe3 57 C a me I'mODuc fiON w

IIIe CyJ

'b January 13, 1976

  • $$c h

if 09Y F

%dtgk 5

Mr. Norman C. Moseley, Director db

'g, q

h & 9 h','

r,5'$

j U. S. Nuclear Regulatory Commission Y

e, g4 % ey 5*~

6 Suite 818 h h%

(

230 Peachtree Street, Northwest Atlanta, Georgia 30303 Icht \\

g

((D Re:

IE:II:TNE 50-269/75-10 50-270/75-11 50-287/75-11

Dear Mr. Moseley:

My letter of November 21, 1975 stated that a training program concerning Oconee emergency power would be established and administered to area dispatchers, system dispatchers, Lee operating personnel, Steam Production operating personnel and Central Switchyard operating personnel.

In that letter it was stated that the training course was under preparation and would be administered by January 15, 1976. The training course has been prepared, a practice session has been given, and the first group of personnel will receive the training on January 15, 1976. However, since most of the personnel are on shift work, several sessions of the training course will be necessary. These sessions will be given weekly and will be completed by February 12, 1976.

Ver ruly yours,,O -

M tao. _ d. c V'

WilliamO. Parker,Jr.d MST:mmb T912040 VW