ML19322B563

From kanterella
Jump to navigation Jump to search
Responds to 730705 Telcon W/Aec.Forwards Revision 3 to Valve Wall Thickness Rept. W/O Encl
ML19322B563
Person / Time
Site: Oconee  
Issue date: 09/13/1973
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7912040592
Download: ML19322B563 (2)


Text

.

1

. _ _ t)

,f ' -

(

Letter from Duke Power Company-

4. 4. Thies, 007 2 573 dated September 13, 1973 50-269 270 and 287 Ltr w/ enc 1:

H. D. Thornburg

  • Ltr w/o enc 1:

RO:HQ (4)

Directorate of Licensing (4)

=$7+DR Central Files PDR Local PDR NSIC OIS, OR State

  • Enclosures not included due to length of enclosures.

I i

l 7012040 N d;j,gc

-?*

o

( DUKE POWER COMPMY Powrm Bust.orno 4aa SouTu Cnuncu STazer, CHARICTTz, N. C. menos ei,oIvc,52o.,

P. O. Da mim e ooucv....o v.........

September 13, 1973 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region "I - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re:

RO:II:JGD 50-269, -270, -287 Valve Wall Thickness Measurements

Dear Mr. Moseley:

Please find enclosed ten copies of Revision 3 to our Valve Wall Thick-ness Report for Oconee Nuclear Station, Units 1, 2, and 3.

As a result of the July 5, 1973 conference telephone conversation between Dresser, Duke Power Company, and Regulatory Operations, Dresser has re-evaluated wall thickness calculations for the pressurizer relief valves 1, 2, 3 RV-67.

Revision 3 to the wall thickness report for Oconee Nuclear Station incorporates the results of these calculations.

Very truly yours, A. C. Thies ACT:vr Enclosures

'N

., _ - -