ML19322B554

From kanterella
Jump to navigation Jump to search
Notifies of 740601 Submission Date for Final Rept Re Valve Wall Thickness Verification Program
ML19322B554
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/14/1973
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7912040583
Download: ML19322B554 (2)


Text

.-

J Dmtr PowEn COMPANY

.t3 r

(

Powra Buzz.orwo 422 Sourn Gnunen STsu:rT, CuARI.OTTr., N. C. asaoi e

A C THets P. O. Box carts saw.0a vecc pacsiorme PRODu TION A m t-T a a htme i st sO*e November 14, 1973 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Co:nission Region II - Suite 818 230 Peachtree F1reet, Northwest Atlanta, Georgia 30303 Re: RO:II:JGD 50-269, -270, -287 Valve Wall TLichness Measurements i

Dear Mr. Moseley:

My letter of June 8, 1973 identified November 15, 1973 as the submission date for the Oconee Unit 3 Valve Wall Thickness Verification Report.

It is now our intention to submit one final report concerning the valve wall thiciness verificatica program for Oconee Nuclear Station.

This report will be submitted following resolution of all outstanding items and will offer a complete Duke audit of the valve wall thickness verifi-cation program.

This final report should be ready for submission by June 1, 1974.

The preparation and submittal of this report will not affect the actions being taken to justify the Drcsser relief valves RC-66.

Very truly yours,

[d, [ M.&.Sa.r n 2

A. C. Tbi ' s 8<.x e

ACT:vr vnso4o 573 g;

., r f-Q*

p,.v r.

Letter from Duke Pouer Company, A. C. Thies, dated November 14, 1973 50-269, -270, and -287 DISTRIBL'TIOF:

H. D. 'rnornburC RO:HQ (4)

Directorate of Licensing (4)

- - DR Cent,ral Files PDR Local PDR USIC OIS, OR State f

i r

..