Notifies of Inability to Meet 741001 Deadline for ATWS Analysis Submittal.Expected Submittal Now 741213,following Review of B&W Rept Addressing WASH-1270,Anticipated Transients W/O Scram for Water Cooled Power Reactors
ML19322B532
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/23/1974
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912040561
Download: ML19322B532 (1)


Text

' '... ~. ~

?Y3 )

('

DUKE POWER COMPANY POWER BUILDING 422 SouTu Cuencu STazET, CHARIDTTE, K C. 28201 A. C. Turcs st='oe wec hcs.ota' P. O. Box 217e NODUCT4m A8sC Team,WiSSIOes September 23, 1974 Mr. Angelo Giambusso

'.'.., w Deputy Director for Reactor Projects Ot g :

Directorate of Licensing

~

' " ' " M' T.

Office of Regulation C

. 3. '

U. S. Atomic Energy Commission Washington, D. C.

20545

"; '""% \\'d'

<N Re: Oconee Nucl tation Docket No 50-

, -270, -287

Dear Mr. Giambusso:

On December 21, 1973, Duke Power Company responded to your letter of October 9, 1973 and stated when B&W and the AEC regulatory staff have reached agreement on additional analyses necessary to satisfy the ATWS criterion, these analyses would be subritted for review.

Babcock & Wilcox has informed Duke Power Company that additional time is necessary to ensure the methods used for ATWS events analyses are reasonably predicting transient consequences. Therefore, we regret that we will not be able to respond to ATWS by October 1, 1974.

The B&W topical report to address ATWS and WASH-1270, " Anticipated Tunsients Without Scram for Water-Cooled Power Reactors," is expected to be submitted on December 13, 1974. Our response to ATWS will be transmitted as soon as possible following review of the B&W topical report.

Very truly yours, A. C. Thies i