Requests Initial Fuel Cycle Extension to Allow First Reactor Core to Be Operated Up to 7,500 Effective Full Power Hours. Fuel Loading Expected to Begin Approx 741101
ML19322B527
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/23/1974
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912040557
Download: ML19322B527 (1)


Text

.. _. _ _ _ _ _ _ _ _ _ _ _ _

e DUKE POWER COMPAM*

Powra Dutt.omo 42a SorTu Caracn STazrT. CHARICTTz.N C. asnos A. C. Tunes P.o. Box give sr.+. wcc r.c, e.-

m e s.,a...e,...s.,wo.

,[M; 'p,, \\

July 23, 1974

-N

[F

~

Mr. Angelo Giambusso h

  • b$D Deputy Director for Reactor Projects

\\$

7 d

O, [I.

,J.

Directorate of Licensing

?/

Er Office of Regulatien U. S. Atomic Energy Commission W T -- - ( l'-

Washington, D. C.

20545 AM' Re: Oconee Unit 1 Docke; No. 50-269

Dear Mr. Giambusso:

Section 1.2.8 of the Oconee Nuclear Station Technical Specifications states that the time between normal refuelings of the reactor should not exceed 18 months without prior approval of the AEC.

Initial fuel loading of Oconee Unit 1 commenced on February 9, 1973; the 18 month interval would extend to August 9, 1974.

Startup and power escalation have resulted in low initial fuel utilization.

Based on current burnup dato and a projected capacity factor, Oconee Unit 1 may be operated until approximately November 1, 1974 without exceeding the operating limit of 7500 effective full power hours established by Technical Specification 3.11.1 for the first core.

It is our understanding that the 18 month refueling period set by Section 1.2.8 is intended to assure that surveillance requirements identified in Section 4 of the Technical Specifications, which are specified as to calendar interval, are performed at intervals not exceeding 18 months.

For Oconee Unit 1, all surveillance specified as to calendar interval has been performed such that the 18 month interval will not be exceeded.

Therefore, we request that the Oconee 1 initial fuel cycle be extended to allow the first reactor core to be operated up to 7500 effective full power hours. We expect fuel loading for Ocor.ee 1 to begin approximately November 1, 1974.

Very truly yours,

\\