Responds to AEC Re Violations Noted in Insp Rept 50-269/74-02.Corrective Actions:Operational Limits Redefined,Radwaste Drumming Facility Operating Procedure Written & Procedure PT/O/A/0270/34 Rewritten
ML19322B520
Person / Time
Site: Oconee 
Issue date: 04/10/1974
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19322B518 List:
References
NUDOCS 7912040551
Download: ML19322B520 (4)


Text

..

}

DUKE POWER CoxpAwN-Powrn Durz.orwo 422 Sourn Gnuncu SinccT, CnARLoTTE,N. C. seno A. C. Tuins si..

v u paesiec -

p. o. sox ene e.aow.a.

.,.. s,we April 10, 1974 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re:

RO:II:TNE 4

50-269/74-2

Dear Mr. Moseley:

Please find attached our responses to Items I.A.a through I.A.d contained in RO Iuspection Report 50-269/74-2.

Duke Power Company does not consider any information contained in RO Inspection Report 50-269/74-2 to be proprietary.

Very truly yours, WJ A. C. Thies ACT:vr Attachment i

t Y9.1,20_40 N___

s s

f DUKE POWER COMPANY OCONEE UNIT 1 RESPONSE TO RO INSPECTION REPORT 50-269/74-2

_I.A.a Core Imbalance The limits of +5 percent and 210 percent imbalance in Operating Procedure OP/1/A/1102/4, " Operation at Power," provide a margin of conservatism within the imbalance limits specified in the Oconee Technical Specifications. To preclude future situations where these operational limits are more con-servative than the Technical Specification limits, operational limits will be redefined as operator guides or will be changed to limits which are compatible with those contained in the Technical Specifications.

In this particular procedure, the power imbalance limits of +5 percent and -10 percent have been changed to the Technical Specification limits. An operating guide which is approximately 1 percent within the Technical Specification imbalance limits has 1so been, defined.

I.A.b Radioactive Waste Drumming Since the AEC/R0 audit ending on March 1,1974, a procedure, OP/l&2/A '1104/28, has been written and approved for operation of the radioactive waste drumming facility. This procedure includes health and safety aspects of operation of this facility.

The limits and precautions section provides that all work in the drumming area shall be done under an approved radiation work permit, which specifies the health physics precautions which must be taken in th'e drumming operation, including requirements for contamination protective equipment, personnel dosimetry, respiratory equipment, and allowable stay times.

I.A.c Main Steam Relief Valve Tests Procedure PT/0/A/0270/34, " Main Steam Relief Valve Setpoint Tests," has been revised to provide sign-off blanks to document that communications are established with the control room, that the prerequisite conditions are fulfilled, and that the Assistant Maintenance Engineer has reviewed the results of this test. Additionally, a review will be made of all maintenance procedures to assure that they meet the requirements of the Stcom Production Department Administrative Policy Manual for Operational Quality Assurance of Nuclear Stations.

It is anticipated that this review will be completed by May 1, 1974.

I.A.d Failure to Implement QA at Keowee The Keowee Hydro Station, which supplies emergency power to Oconee Nuclear Station, is under the operational control of the Operating Department, and j

Oconee Nuclear Station is under the Steam Production Department. Therefore, i

i

+

i

f

(

(

-. (

l 1

to assure that the design of Oconee is not degraded by uncontrolled modifi-cations to Keowee, an interface plan between the Operating Department and Oconee I;uclear Station is being developed, and will be available by May 1, 1974. The plan will require that caintenance and modification activities at Keowcc on safety-related systems, structures, and components will be done in j

j accordance with written, approved procedures.

Tnese procedures will be j

reviewed by the Oconee Station Revian Committee and approved by the Oconee Superintendent prior to the.. work activity.

l In order to assure that items at Keowee Hydro Station are properly classified as saf ety-related or non-safety-related, a list of. safety-related structures, j

systems, and components will be developed by May 1,1974.

In effect, modifi-l cations and maintenance on safety-related systems at Keowee will be handled in a similar manner to those at Oconee.

i P

i f

L j

i I

e I

I, i

)

i I

I mg-y

-me, ty.-

---c--

n.

Letter to Duke Power Company from N. C. Moseley dated j,ag

? 1974 50-269/74-2 Letter from Duke Power Company, A. C. Thies, dated April lJ, 1974 DISTRIBUTION:

H. D, Thornburg, RO RO:HQ (4)

Directorate of Licensing (4)

/

> DR Central Files cc encl. only:

Mr. J. E. Smith, DPC Seneca, South Carolina PDR Local PDR NSIC DTIE, OR State i