ML19322B490
| ML19322B490 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/12/1973 |
| From: | Thies A DUKE POWER CO. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-73-01, IEB-73-1, NUDOCS 7912030326 | |
| Download: ML19322B490 (2) | |
Text
a.
C) DUKE POWER COMPm
~)
f4
^
1 f
Powra Buzz.orwe j
4aa SouTu Caunca SrazzT, CHARI.CTrz,N. C. assos A. C. THits P. O. Box 217e senion vics P=ssiosar PmOoWCTION AND Tnansesassoon April 12, 1973 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re: Oconee Nuclear Station RO:II:50-269, -270, and -287
Dear Mr. Moseley:
In response to Mr. J. G. Davis' letter of February 21, 1973 and AEC/DRO Bulletin No. 73-1, we have determined that there are no Westinghouse circuit breakers, Models DB-25, DB-50, and DB-75, installed or scheduled to be installed at Oconee Nuclear Station.
It was found, however, that the Keowee Hydro Station has installed six type DB-50 and ten DB-25 breakers. A program of replacement of the overcurrent. trip devices in the DB-50 breakers with ones of a new design has been implemented and it is anticipated that the replacement devices will be installed within 90 days.
The overcurrent trip device on the DB-25 breaker is of a different design from that on the DB-50 breaker.
The DB-25 breakers were inspected and no faulty overcurrent trip devices were revealed.
For these reasons, no replacement of these devices is planned. All Model DB-25 and DB-50 breakers installed at Keowee Hydro Station will be inspected annually to insure their proper operation.
Very truly yours, A. C. Thies ACT:vr 79aoao 316
-g r,,
,-e, es---
m
r*,
MAY1 1973 Letter from Duke Power Company dated April 12, 1973 - RO Bulletin No. 73-1 DISTRIBUTION:
J. B. Henderson, RO J. G. Keppler, R0 RD:HQ (4)
Directorate of Licensing (4) h DR Central Files PDR Local PDR NSIC OIS, OR
.~
.s
.n,o
.mnm oo
--.-.-.m.e.
-w, m---
., _. _,. _ _