Reactor Bldg Structural Instrumentation Rept. Submitted W/ Amend 25 to License Application for Unit 1ML19322B477 |
Person / Time |
---|
Site: |
Oconee |
---|
Issue date: |
12/30/1970 |
---|
From: |
DUKE POWER CO. |
---|
To: |
|
---|
References |
---|
NUDOCS 7912030315 |
Download: ML19322B477 (4) |
|
|
---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20153G4601998-09-30030 September 1998 USI A-46 Seismic Evaluation Rept, Vols 1-2 ML20077D0671991-11-15015 November 1991 Nonproprietary Version of Rev 0 to Boric Acid Corrosion of Oconee Unit 1 Upper Tubesheet ML20154K2091988-09-0909 September 1988 Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld ML20151T2571985-12-20020 December 1985 Mechanical Maint Technical Rept, Unit 3 Containment Bldg Tendon Surveillance, Jul 1977 - Jul 1980 ML20135G5891985-09-0303 September 1985 Rev 0 to B&W Owners Group Emergency Operating Procedures Technical Bases Document. W/Three Oversize Drawings ML20151K2671984-03-31031 March 1984 Final Rept:Failure Modes & Effects Analysis of Integrated Control Sys/Non-Nuclear Instrumentation Electric Power Distribution Circuitry, Vol 1 - Main Rept & Vol 2 - App a ML20151K2491984-03-29029 March 1984 Draft Oconee-1 AC Electrical Distribution Control & Protection Design Features ML20151K2761983-10-28028 October 1983 Failure Modes & Effects Analysis for Oconee 1 Nuclear Power Station Makeup & Purification Sys ML20080E0101983-10-0303 October 1983 Failure Modes & Effects Analysis for Oconee 1 Nuclear Power Station Makeup & Purification Sys, Preliminary Draft ML20080E6061983-08-26026 August 1983 Failure Modes & Effects Analysis of Integrated Control Sys/ Non-Nuclear Instrumentation Electric Power Distribution Circuitry, Interim Rept ML20072B7961983-02-15015 February 1983 Control Room Review Plan for Oconee,Mcguire & Catawba Nuclear Stations,Duke Power Co ML20117J3641983-01-31031 January 1983 Evaluation of Oconee Nuclear Station,Duke Power Co ML20117J3571981-07-31031 July 1981 Evaluation of Oconee Nuclear Power Station ML19323A1621980-03-26026 March 1980 TMI-Plus One:Toward a Safer Nuclear Power Program. ML19249D8631979-09-30030 September 1979 Description of Proposed Mod to Radiological Effluent Treatment Facility, Preliminary Rept.Oversize Drawings Encl ML19308A7471979-09-27027 September 1979 Jocassee Development Rept on 790825 Earthquake & Effects on Jocassee Structures. ML19322B8741979-08-24024 August 1979 Addl Info to 790824 Response to IE Bulletin 79-05C Nuclear Incident at TMI Including Supplemental Small Break Analysis ML19312C1281979-08-16016 August 1979 Mgt & Technical Resources:Experience & Qualifications of Steam Production Dept General Office Staff. ML19312C7981979-07-30030 July 1979 Response to IE Bulletin 79-05C, Nuclear Incident at Tmi. ML19259C4821979-05-0909 May 1979 Effect of Closing Oconee Nuclear Plants on Ability to Meet Summer Peak Demands. ML19312C5841978-07-14014 July 1978 Proposed Mod of Hpis. ML19316A1201978-07-14014 July 1978 Rept on Seismic Activity at Lake Jocassee,780301-0531. ML19316A1351978-04-0404 April 1978 Rept on Seismic Activity at Lake Jocassee,771201-780228 ML19319A7261978-03-0101 March 1978 Info & Evaluation Re Fracture Toughness of Steam Generator & Reactor Coolant Pumps Support Matls. ML19354C2851978-02-28028 February 1978 Possible Geologic/Seismicity Relationships in Vicinity of Facility from Available Data & Repts. Oversize Maps Encl ML19354C2861978-01-19019 January 1978 Rept on Preliminary Investigation of Seismicity Near Lake Keowee,Oconee County,SC,771230-780115. ML19317E6991978-01-16016 January 1978 Fire Protection Program Comparison to NRC Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls & Qa. ML19316A1231977-11-30030 November 1977 Rept on Seismic Activity at Lake Jocassee,770901-1130. Oversize Earthquake Charts Encl ML19317E7261977-10-14014 October 1977 Fuel Assembly 1D40. ML19312C5811977-09-24024 September 1977 Generator Tube Leak Status Rept. ML19316A1301977-09-0202 September 1977 Jocassee Dam Northwestern Sc:Estimate of Existing Strain & Cracking Potential from Hypothetical Foundation Displacements. ML19319A7301977-08-31031 August 1977 Safety Assessment of Steam Generator Tube Leakage. ML19316A1361977-08-31031 August 1977 Rept on Seismic Activity at Lake Jocassee,770601-0831. Oversize Map Encl ML19316A1291977-08-26026 August 1977 Steam Generator Tube Leak Status Rept. ML19308A8381977-07-18018 July 1977 Requalification Program for NRC Licensed Personnel, 731211.Revised on 740703,750107,0221,760930 & 770718 ML19316A3121977-04-21021 April 1977 Evaluation of Potential for Turbine Bldg Flooding. ML19312C3611977-03-30030 March 1977 Qualification of Power Distribution Connector for Use in 15kV Rated Medium Voltage Electrical Penetrations. ML19312C1251977-03-22022 March 1977 Rept on Seismic Activity at Lake Jocassee Between 760601 & 770228. ML19316A1131976-12-31031 December 1976 Response to App a to Branch Technical Position Apcsb 9.5.1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to 760710. ML19317D7041976-10-14014 October 1976 Evaluation of Potential Reactor Vessel Overpressurization. ML19308B2771976-10-0101 October 1976 Engineering Geology of Keowee-Toxaway Project. ML19260C1781976-09-30030 September 1976 Jocassee Hydro-Station Seismic Studies Summary Rept. Cover Ltr & Oversize Drawings Encl ML19312C1591976-08-0606 August 1976 Evaluation of Post-LOCA Boric Acid Concentration Control Sys for Facility Reactors. ML19340A1241976-04-16016 April 1976 Criticality Evaluation for Dry Storage of Fresh Fuel Assemblies in Oconee Unit 3 Spent Fuel Pool. ML19316A1171976-04-13013 April 1976 Attachment A:Structural Analysis of Worn Surveillance Specimen Holder Tubes. ML19340A1571976-04-12012 April 1976 Surveillance Holder Tube Rept. ML19322B6161975-12-18018 December 1975 Methods to Prevent Boron Precipation in Long-Term Following Postulated Loca. ML19322B6121975-11-14014 November 1975 Reactor Vessel Support Evaluation for LOCA Loadings. ML19312C8231975-08-12012 August 1975 Safety Evaluation Supporting Util Application to Amend License DPR-55 for Mod of Spent Fuel Storage Facility ML19317E5061975-08-0101 August 1975 Partial Loop ECCS Analysis. 1998-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20206P1501999-01-0505 January 1999 LER 98-S03-00:on 981207,security Officer Discovered Uncontrolled Safeguards Info Drawing.Caused by Failure to Follow Established Procedures & Policies.Drawing Was Controlled by Site Security.With ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198E6381998-12-17017 December 1998 LER 98-S02-00:on 981130,security Access Was Revoked Due to Falsification of Criminal Record.Individual Was Escorted from Protected Area & Unescorted Access Was Restricted. with ML20153G4601998-09-30030 September 1998 USI A-46 Seismic Evaluation Rept, Vols 1-2 ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML15261A4681998-09-0404 September 1998 Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20247L9041997-12-31031 December 1997 1997 Annual Rept for Duke Energy Corporation & Saluda River Electric Cooperative,Inc,Financial Statements as of Dec 1997 & 1996 Together W/Auditors Rept ML20198J7651997-10-15015 October 1997 Safety Evaluation Accepting 10-yr Interval Insp Program Plan Alternatives for Listed Plants Units ML20148S3141997-06-30030 June 1997 Ro:On 970422,Oconee Unit 2 Was Shut Down Due to Leak in Rcs. Leak Was Caused by Crack in Pipe to safe-end Weld Connection at RCS Nozzle for HPI Sys A1 Injection Line.Unit 1 Was Shut Down to Inspect Hpis Injection Lines & Implement Ldst Mods ML20148H2501997-06-0505 June 1997 Safety Evaluation Accepting Proposed Restructuring of Util Through Acquisition Of,& Merger W/Panenergy Corp ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML20134N7121997-02-20020 February 1997 Safety Evaluation Accepting Relief Request 96-04 for Plant ML20138L2151997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3 ML20138L2281996-12-31031 December 1996 Revised Monthly Operating Repts for Dec 1996 for Oconee Nuclear Station,Units 1,2 & 3 ML20133C1231996-12-23023 December 1996 Informs Commission of Staff Review of Request for License Amends from DPC to Perform Emergency Power Engineered Safeguards Functional Test on Three Oconee Nuclear Units ML20115F2471996-07-0303 July 1996 Part 21 Rept Re Piping (Small Portion of Unmelted Matl Drawn Lengthwise Into Bar During Drawing Process) Defect That Existed in Bar as Received from Mill.Addl Insp Procedure for Raw Matl Instituted ML20107M8931995-10-31031 October 1995 Nonproprietary DPC Fuel Reconstitution Analysis Methodology ML17353A4341995-10-31031 October 1995 Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range. ML17264A1181995-07-31031 July 1995 Response to Part (1) of GL 92-01,Rev 1,Suppl 1. ML20086M0851995-06-29029 June 1995 DPC TR QA Program ML20077R3631994-12-31031 December 1994 Monthly Operating Repts for Dec 1994 for Bfnpp ML20236L5971994-12-29029 December 1994 SER in Response to 940314 TIA 94-012 Requesting NRR Staff to Determine Specific Mod to Keowee Emergency Power Supply Logic Must Be Reviewed by Staff Prior to Implementation of Mod ML20064L2001994-01-31031 January 1994 Final Rept EPRI TR-103591, Burnup Verification Measurements on Spent-Fuel Assemblies at Oconee Nuclear Station ML20062K7481993-12-0101 December 1993 ISI Rept for Unit 2 McGuire 1993 Refueling Outage 8 ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20046C1291993-08-0202 August 1993 LER 93-007-00:on 930701,determined That Unit 1 Ssf Rc Makeup Sys Inoperable in Past Due to Design Deficiency.Operations Procedures Revised to Reflect Newly Calculated Operating Limits for Rc Makeup Pump,Rcps & RCS.W/930802 Ltr ML20056G0131993-07-27027 July 1993 Rev 0 to ISI Rept Unit 2 Oconee 1993 Refueling Outage 13 ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20117A5981992-11-23023 November 1992 Special Rept:On 921119,ability of Control Battery Racks to Withstand Seismic Event Could Not Be Confirmed & Batteries Declared Inoperable.Batteries Expected to Be Restored in TS Required Time ML20097G0421992-05-31031 May 1992 Analysis of Capsule OCIII-D Duke Power Company Oconee Nuclear Station Unit-3 ML20077D0671991-11-15015 November 1991 Nonproprietary Version of Rev 0 to Boric Acid Corrosion of Oconee Unit 1 Upper Tubesheet ML20067A5241990-12-31031 December 1990 Final Submittal in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' ML20042F3541990-04-30030 April 1990 Special Rept Re Failure to Prevent Performance Degradation of Reactor Bldg Cooling Units.Caused by Mgt Deficiency & Inadequate Program.Cooling Unit Declared Inoperable & Removed from Svc for Cleaning & Placed Back in Operation ML17348A1621990-03-27027 March 1990 Part 21 Rept Re Matls W/Programmatic Defects Supplied by Dubose Steel,Inc.Customers,Purchase Order,Items & Affected Heat Numbers Listed ML19332D5391989-10-31031 October 1989 Core Thermal-Hydraulic Methodology Using VIPRE-01. ML20042F2321989-08-31031 August 1989 Nonproprietary DCHF-1 Correlation for Predicting Critical Heat Flux in Mixing Vane Grid Fuel Assemblies. ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20154K2091988-09-0909 September 1988 Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld ML20245D9541988-09-0606 September 1988 Part 21 Rept Re Condition Involving Inconel 600 Matl Used to Fabricate Steam Generator Tube Plugs & Found to Possess Microstructure Susceptible to Stress Corrosion Cracking ML20245B6061988-08-31031 August 1988 Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept ML20239A6991987-11-30030 November 1987 Addendum 1 to Rev 2 to Integrated Reactor Vessel Matl Surveillance Program (Addendum) ML20236T0791987-11-25025 November 1987 Advises LER 269/87-09,re Degradation of More than One Functional Unit of Emergency Power Switching Logic for Units 2 & 3,in Preparation & Will Be Submitted by 871215. Incident Originally Discussed in Special Rept ML20236Q9491987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 ML20235W9611987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 ML20234B1861987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 ML20237K4761987-07-31031 July 1987 Monthly Operating Repts for Jul 1987 ML20236Y0221987-07-0808 July 1987 Safety Evaluation Clarifying Determination of Acceptability of Test Duration for Performance of Integrated Leak Rate Test at Plant ML20235S6311987-06-30030 June 1987 Monthly Operating Repts for June 1987 1999-01-05
[Table view] |
Text
. .. . . - . - . - . _ - - - .-. . - . - . . . _ - . _ - . _ .
. . .=. .
1
?
o DUKE POWER COMPANY i
- OCONEE NUCLEAR STATION UNIT 1 ONLY Regutatory Flie C. '
LICENSE APPLICATION menvet vw unte /2 y C.7g _
-m DocketNos.'50-26h-270,and-287
> s 1
REACTOR BUILDING STRUCTURAL INSTRUMENTATION REPORT i
1 1
g ,
Y V%
Submitted with Amendment No. 25 December 30, 1970
$*CT 3s120a03 #
- 1. Purpose of Structural Instrumentation Unit 1 Reactor Building was instrumented to verify the design by comparing the calculated behavior with measured strain data obtained during the structural test.
The following instruments were installed in Unit 1 Reactor Building as shown on Figure 5-21, Sheets 1, 2 and 3, Section 5 of FSAR:
Quantity Mark Desionation 118 SGA-1 Two element strain rosette attached to rebar.
9 SGE-2 Linear element attached to concrete surface.
6 SGC-3 Crack propagation gages attached to concrete surface.
18 SGR-4 Three element rosette attached to inside and outside face of liner and penetration nozzles.
26 S FT-5 Two element rosette attached to inside and outside face of liner and penetration nozzles.
7 LC Load cells attached to the tendons.
26 CB Calibrated deflection bars attached to concrete surface.
1 -
Cement paint area on concrete surface.
- 2. Purchase and installation of Gaqes The gages were purchased by Specification OS-267A, " Specification for Reactor Building instrumentation," dated March 31, 1967. The specification listed the schedule requirements and stated that the proof test would be performed January 1, 1970. Due to unforseen circumstances, the proof test has been delayed by approximately one year.
The gages were installed in accordance with Specification 05-267B, "Specifi-cation for Reactor Building Instrumentation Installation," dated November 30, 1967, and revised April 8,1968. A conference was held with the sup-plier's representative to review the installation specification and methods of gage installation.
Prior to installing the gages, the supplier held a training session with Field Personnel on the proper methods and procedures for gage installation.
Gages mark SGA-1 were fabricated and waterproofed in the supplier's shop.
The test results were reviewed by Duke Engineering and found to be accept-able, in addition, the gages were waterproof and load tested by Duke prior to installation and found to be satisfactory. The SGA-1 gages were installed between January,1968 and January,1970.
3 Performance of Gages The gages performed satisf actorily through April 1970, with only five per-cent losses. In May 1970, a significant number of gage failures began to occur.
s m.
The status of gages on November 28, 1970 was as follows:
Number Number Number Gage Mark inoperative O pe rat ive Being Replaced SGA-1 114 4 (See 4b below)
SGE-2 7 2 (See 4b below)
SGC-3 0 6 -
SGR-4 7 11 6 S FT-5 7 19 6 LC (Load Cell) 1 6 (See 4d below)
CB (Calibrated Bar) 0 26 -
The gage losses have been ir.vestigated by Duke, Bechtel and the Supplier.
It was concluded that the gage losses (increase in gage resistance) was .
caused by chemical etching. The waterproofing material, Epoxylite 222, has broken down and moisture mixed with concrete chemicals has penetrated into the grid area and attacked the gages.
One of the load cells is inoperative due to moisture penetrating the water-proofing and grounding the gages.
- 4. Proposed Instrumentation Program Since a significant number of embedded gages are inoperative, we believe it prudent to verify the design by (a) utilizing test results from Palisades and, (b) continuing with the Oconee Structural Test, as noted below:
a) The design and construction of Palisades and Oconee Reactor Buildings are very similar. The Palisedes' structural Instrumentation progro .
was successful and permitted a detailed comparison between desigr. cal-culations and observed response.
b) At Oconee, the calibrated bars (optical measurements) will permit veri-fication that the structural response is consistent with the predicted behavior. In addition, twenty-six Carlson SAIOS strain gages will be surface mounted on the Reactor Building to obtain concrete strains for comparison with Palisades and those predicted for Oconee. (See attached Figure 5-21, Sheet 4),
c) Six inoperative gages mark SGR-4 and SFT-5 are accessible and will be replaced to obtain data for comparison with Palisades and predicted strains for Oconee.
d) Load cells that are inoperative will be repaired or supplemented with prestress rams that have been modified with 20 psi division gages to measure tendon forces. Prestress rams were used at Palisades and per-formed satisfactory. Results of measured forces can then be compared with those predicted.
1 3-
- 5. Summary of Palisades Structural Integrity Test (Submitted to AEC by Consumers Power Company, December 1970) 1 !
The containment test provided data on structural behavior for assessment of the design methods. Test measurements included concrete, reinforcing steel and liner streins; concrete temperatures; prestressing tendon forces; overall displacements; and concrete cracking patterns.
Test measurements were made at locations where analytical predictions of the measured parameters were expected to be accurate and at locations where supplemental information on structural behavior was deemed useful. Approxi-mately 450 sensors were used to obtain the test data.
Measurement of concrete strain was the primary means of evaluating the re-sponse of the structure to dead load, prestressing and pressure loadings.
Rebar-mounted strain gages and embedded Carlson meters we,e the principal sensors used to obtain strain Information.
For the prestressing plus test pressure condition, the concrete was com-pressed showing that the pressure could have been higher without reducing the compression strain to zero. As expected, the pressurization resulted in only a 1 to 3 percent increase in the prestressing force, an amount that is considered negligible. This demonstrates that pressurization causes
- negligible cycling of loads in the prestressing tendons which are an impor-tant contributor to the containment strength.
The test data showed that the containment met design criteria and shows Agreement with oredictions made with the design methods. There was no evi-dence of structural Instability or loss of equilibrium. The strains result-ing from prestr essing were within the expected range and the residual strain resulting from pressurization was negligible. There was, therefore, direct evidence that the structure can safely sustain the two largest loads, pres- !
sure and prestressing.
i l 6. Conclusion Unit 1 Reactor Building design will be verified by: (1) comparing the cal-
- culated behavior with measured strain data obtained during the structural test from operative Instruments supplemented with the replacement of access-ible Inoperative gages and the addition of 26 Carlson sal 0S strain gages and (2) utilizing the Palisades structural integrity test results since the de-
, sign and construction of Oconee Reactor Buildings and Palisades are very similar.