Notifies of Util Position on Section 4 of Tech Specs Re Surveillance Requirements.Will Assume Position Is Correct If No Response Received within 30 Days
ML19322B457
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/25/1975
From: Thies A
DUKE POWER CO.
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
NUDOCS 7912030296
Download: ML19322B457 (1)


Text

n

~

.r'..,

a DUKE POWER COMPANY

- ~... '

Powna Burt.orwo 4aa SouTu Cuenca STazzT, CnAnIATTz,N. C. seso A-c twies r,o.nox ante Samson vics PatSiosNT PRODUCTIOh AND TA ANStef S$10h March 25, 1975 Mr. Angelo Giambusso, Director Division of Reactor Licensing U. S. Nuclear Regulatory Commission v,

Washington, D. C.

20555 4.

m

,.~ ~.

Re: Oconee Nuclear Station 5.3 +-

s

  1. ~

Docket Nos. 50-269, 50-270, 50-287

Dear Mr. Giambusso:

Section 4, Surveillance Requirements, of the Oconee Nuclear Station Technical Specifications requires that certain surveillance of structures, systems and components be performed at specified frequencies, e.g., weekly, monthly, annually, etc. Associated with the various frequencies specified are maximum allowable intervals between successive surveillances.

With regard to the initial performance of such surveillance items for which a frcquency is specified, it is Duke Power Company's position that the beginning date for the interval specified in the Technical Specifications is the date of issuance of the Facility Operating License for a unit.

For example, a surveillance specified to be performed annually for a particular unit could be performed in accordance with the Technical Specifications, up to eighteen (18) months following issuance of the Facility Operating License for that unit.

If we have not heard from you s-ithin 30 days, we shall assume that the above application of Oconee Technical Specifications is correct.

Very truly yours, i

53 A. C. Thies ACT:vr 34U2 7912030

-