ML19322B299
| ML19322B299 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/03/1978 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | OFFICE OF THE FEDERAL REGISTER |
| References | |
| NUDOCS 7912020147 | |
| Download: ML19322B299 (1) | |
Text
._. : _ _. '
i Ip* "8 G%
7 UNITED STATES c
10 sNUCLEAR REGULATORY COMMk,ON d
'f
(
WASHINGTON, D. C. 20655
'h-M/
OFFICE OF THE OYO=bOI 3' 1978 SECRETARY Di rec to.-
Office cf the Federal Register National Archives and Records Service ~
Washington, D.C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:
DUKE POWER COMPANT I
Dockec Uos. 50-269/270/287 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES AND NEGATIVE'52CfARAfION
~
~
Publication of the above document at the earliest possible date would be appreciated.
This material is to be charged to requisition number E-la6.
Sincerely, Samuel J. Chilk Secretary of the Commission
Enclosures:
Original and 2 certified copies bec: tRecords Facility Branch Office of Public Arraics Executive Legal Director Office of Congressional Affairs Office of the General Counsel SECY - CLR Branch
?
f
~
7912020/g
7590-01
-}
)
9 UflITED STATES liUCLEAR REGULATORY C0fiMISSION 00CKETS NOS. 50-269, 50-270 AMD 50-287 DUKE POWER C0ftPANY j
NOTICE OF ISSUANCE OF Af1ENDMENTS TO FACILITY OPERATING LICENSES AND NEGATIVE DECLARATION e
The U. S. Nuclear Regulatory Commission (the Commission') has issued Amendments Nos. 65, 65 and 62 to Facility Operating Licenses Nos. OPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company, which revised Technical Specifications for operation of the Oconee Nuclear Station, Units Nos.1, 2 and 3 located in Oconee County, South Carolina.
The amendments are effective as of the date of issuance.
The amendments (1) revise the Station's common Technical Specifications to support the operation of Oconee Unit No.1 at full rated power during Cycle 5 after core reload, to add High Pressure Injection pump operability requirements, to add procedures for remote operation of the High Pressure Injection System, and to remoYe the orifice rod assemblies from the core; and (2) permit the use of five previously burned fuel assemblies which will be irradiated for a fourth cycle as part of a fuel demonstration program.
The applications for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations.
The Commission has made appro-priate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amend-ments.
Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.
fO 7?
m /toyco77
7590-01 2-The Comission has prepared an environmental impact appraisal for the fuel demonstration program (Item 2, above) and has concluded that an environmental impact statement for this particular action is not warranted because there will be no appreciable environmental impact attributable to this action.
The Commission has determined that the issuance of Item 1, above, will not result in any significant environmental impact and that pur-suant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.
For further details with respect to this action, see (1) the applications for amendment dded April 20 and June 26, 1978, as supplemented April 27, August 21, 28, September 6, 22 and 26,1978, (2) Amendments Nos.65,65 and 62, to Licenses Hos. DPR-38, DPR-47 and DPR-55, respectively, and (3) the Commission's related Safety Evaluation and Environmental Impact Appraisal.
All of these items are available for public inspection at the Comission's Public Document Room, 1717 H Street, N.W., Washington, D.C. and at the Oconee County Library, 201 South Sprits Street, Walhalla, South Carolina.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D.C.
20555, Attention:
Director,-Division of Operating Reactors.
Dated at Bethesda, Maryland, this 23rd day of Octtber 1978.
i FOR THE NUCLEAR REGULATORY COMMISSION M
t
- d N t'
ha-Robert H. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors 4
a w -
e.-,%_w
. vem ee
=-%---
6m * -
--+