ML19322B269
| ML19322B269 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/12/1979 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | OFFICE OF THE FEDERAL REGISTER |
| References | |
| NUDOCS 7912020119 | |
| Download: ML19322B269 (1) | |
Text
~~
f[,sd "!%j(
UNITED STATES
^
-x
.JCLEAR REGULATORY COMMISSI 2
e Q
WASHINGTON, D. C. 20555
[*
a
%.... /
March 12,1979 OFFICE oF THE SECRETARY Director Office of the Federal Register National Archives and Records Service Washington, D.C.
20403
Dear Sir:
Enclosed for publication in the Federal Register are an original and two certified copies of a document entitled:
DUKE POWER C0MPANY Docket Nos. 50-269/270/287 NOTICE OF ISSUANCE OF AMEjjDME?jTS TO FACILITY OPERATING LICENSES Publication of the above document at the earliest possible date would be appreciated.
This material is to be charged to requisition number E-146.
Sincerely, Samuel J. Chilk Secretary of the Commission
Enclosures:
Original and 2 certified copies bec: LRecords Facility Branch j
Office of Public Affairs
\\
Executive Legal Director Office of Congressional Affairs Office of the General Counsel SECY - C&R Branch m202o//9 P
7590-01
]
^
6 UNITED STATES NUCLEAR REGULATORY COMMISSION-DOCKETS NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY g jRATING LICENSES The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendments Nos. 68, 68, and 65 to Facility Operating Licenses Nos.
DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company for operation of the Oconee Nuclear Station, Units Nos.1, 2 and 3, located in Oconee County, South Carolina. The amendments become effective on February 23, 1979.
These amendments add a license condition to include the Comission-approved security plan as part of each license.
The licensee's filing complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the 1icense amendments.
Prior public notice of these amendrents was not required since the amendments do not involve a significant hazards consideration.
The Commission has determined that the issuance of,these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the' issuance of these amendments.
wem
' The licensee's filing dated November 19, 1977, as revised February 1, 1978, September 15, 1978, and February 14, 1979, and the Commission's
~
Security Plan Evaluation Report are being withheld from public disclosure pursuant to 10 CFR 2.790(d).
The withheld information is subject to disclosure in accordance with the provisions of 10 CFR 59.12.
For further details with respect to this action, see (1) Amendments Nos. 68,
68, and 65 to Licenses Nos. DPR-38, DPR-47, and DPR-55, respectively, and (2) the Comission's related letter to the licensee dated FEs90ay ? 1 :979 These items are available for public inspection at the Comission's Public Document Room,1717 H Street, N. W., Washington, D. C. and at the Oconee County Library, 201 South Spring Street, Walhalla, South Carolina. A copy of items (1) and (2) may be obtained upon request addressed to the U. S.
Nuclear Regulatory Comission, Washington, D. C. 20555, Attention: Director, a
Division of Operating Reactors.
Dated at Bethesda, Maryland, this 23rd day of February 1979.
FOR THE NUCLEAR REGULATORY COMMISSI'N i
O 9PMm 3 -hM Morton B. Fairtile, Acting Chief Operating Reactors Branch #4 Division.of Operating Reactors e
e e
-