ML19322B249

From kanterella
Jump to navigation Jump to search
Forwards Comments on Amend 3 to Psar,Re Operation of Unit 3, in Response to AEC 670508 Request
ML19322B249
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/07/1967
From:
INTERIOR, DEPT. OF
To: Price H
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7912020102
Download: ML19322B249 (2)


Text

.

} ",'

~)

'G q 7

r) m

^

q 7

1

5. W

-i.

~

r,f _.

g>; y :5 g o

,.o g, g 4,,, m m o.rc o, ooco.<,,,, -
r. g Flah see leadLies Suevase

,,, _ % p,g, g, m) tra.

-c

=c e

. =<=n r- ; - otes= - -

K TO-O R IG. :

CC:

OTHER:

I. Prios 1

1 ACTICN NECESSARY

]

CCNCLS EENc O

DATE AN$ AttEO-NO ACTION NECE$$ARY

]

JOMMENT e O CLASSIF :

POST OFFICE OL1 COCE:

E DOC m

-270 (SUFFL.ONLI)

  1. fG 40-

.E5CRIPTICN i w BeUwo*'*H M

REFERRED TO DATE RECEIVE 0 BY DATE Lt.r. reponding to our (Mr. Boyd's) 5-8 47 letter regarding aske's 6 s

11:

61d mission of Jammensat me. 3 to the

@ ay.

7 3 K,T3DE rsa to i==1wle unit No. 3.......

ENCLOSURES.

M e Conies toi Dr. Morris Boyd.

I E. Prise &,%ett Levine Skovbolt Loar

" **""5 Distribution 2 r.T. fila eps.

(g4auctras)

I

u. s. Arouic cNsnov couuissioN MAIL CONTROL FORM ronu Arc.22es.
    • r J S GOVE R%Mt47.etgTi%G OFFICE; 1946 - 235 589

'O' 7912020/ON [

q~

IN RE. PLY RIFER TO:

g g

UNITED STATES

~

{

DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE WASHINGTON. D.C.

20240 JUN 7 1967 Mr. Harold L. Price Director of Regulations U. S. At mic Energy Commission Washington, D. C.

20545

Dear Mr. Price:

This is in response to Mr. Roger Boyd's letter of May 8, transmitting Amendment No. 3 to the Preliminary Safety Analysis Report, submitted by the Duke Power Company for its proposed Oconee Nuclear Station, Oconee County, South Carolina. Amendment No. 3 includes an application for a third pressurized water reactor to be known as "Oconee Nuclear Station, Unit No. 3".

In our letter of April 29, we commented only on the effects that Units 1 and 2 would have upon fish and wildlife resources in the project area. We have the following additional comments concerning Unit No. 3.

The addition of a third unit would raise the capacity of the nuclear station to 2,622 megawatts, thereby increasing the possitility of damage to the fishery in the Keowee tailrace and Hartwell Reservoir fra thermal effects. We reaffim our request that the Duke Power Company: (1) conduct pre-end post-operational surveys, including sufficient monitoring of effluents and receiving waters of Lake Keowee and Hartwell Reservoir and collection of related < lhatological data, necessary for the Secretary of the Interior to evaluate the effects of the operation of the two units prior to construction of the third or any additional units; and (2) make any modifications in project strue-tures and operations as may be determined necessary as a result of the surveys.

The opportunity for presenting our views is appreciated.

Sincerely yours, s

. --,_ : w Ca missioner Rec'd 0if. p# yOReg.

ir.

Date_ b

/

Tim e_ __2._'_ f_%_ __ _

~

B e t h._ _ Z_ _ _ __ _ _ __ ___

MO e

-w v