Requests Consulting Svc to Analyze Engineering Factors in Final Design of Facility to Minimize Damage from Seismic Ground Motions.Forwards Psar,Vols 1 & 2 & Fsar,Vols 1 & 2. W/O Encl
ML19322B152
Person / Time
Site: Oconee  
Issue date: 06/13/1969
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Sharpe R
JOHN A. BLUME & ASSOCIATES, ENGINEERS
References
CON-AT(49-5)-3011 NUDOCS 7912020009
Download: ML19322B152 (2)


Text

  • *

^.

n.

L Docket Mos. 50-269 50-270 and 50-287 John A. Slume & Associates Engineers 612 Howard Street San Francineo, California 94105 Attention: Mr. Roland L. Sharpe Executive Vice President Ret Contract No. AT(49-5)-3011 Gentlemen:

John A. Blume & Associates, Engineers, is hereby requested, pursuant to Contract No. AT(49-5)-3011, to provide the following services for the Commission concerning the operating license safety review for the Duke Power Company's Oconee Nuclear Station Units 1, 2, and 3.

1.

Analyses of the engineering factors included in the final design of the facility to =4=f=f sa damage from seismically induced ground motions.

2.

Preparations of a report om (1) above.

3.

Serving as an espert witness in the public hearing on this facility, if required.

Reporting Requiremests: Preparation of a report on (1) above pursuat ta Article I, paragraph (a) of the contract.

All costs shall be itamined and requests for saimbersement shall be submittad. Reports esseerains work, for others shall be made in esserdamse with Artiela I, paragraph (d) and Article 17.

Menetary c'i W -r

$4000 Period of Perfov=== mas JUN 13.%reugh m so,1969 Other Applicable Esquismaests Nome This constitates a Work Muestive persmaat to Artials I, paragraph (b) of Contrast Ee. AT(49-5)-3011..

nona nEMB.

t omca >

SURMAast >

MMk 0_Df1

    1. 8 uteous,asen paurnus carcs;wne 6

- - -,.. - - ~. - -

....a*.._i___

John A. Alums & Associates Ea @ rs g Two sets of Volumes 1 sad 2 of the Final Safety Analysis Esport are enclosed for your review. Also==elamed are two sets of Volumes 1 and 2 of the Preli=4==a Safety Analysis Report (PSAR). These volumes have been updatad with all revised and new pages insertad therein.

We are furnishing ym with these PSAR volumes since the Final Safety Analysis Report refers to eartain portions of the Preliminary Safety Analysis Report.

Sincerely yours, Original Signed by Peter A.Mctris Peter A. Morris, Director Division of Reactor Licensing (Authorized Representative for the Contracting Officer)

Enclosures:

Volumes 1 and 2 FSAR Two sets PSAR, Vols.1 & 2 bec D. L. Bierly, REG R. L. Hart, DC H. T. Jordan, OC Distribution:

Docket (3)

DR Reading DRL Reading RP303 Reading orig: FWKaras (2)

P. A. Morris R. S. Boyd OGC R. C. DeYoung oT y*

omcr > _RP 3-1/ DEL------ -DRL-REB-3/npT.

_OGCg DHL Gk J

n y'.

em= =g f

res-m #

.RSBoyd PAdorris sunname >

om > _.6//g_/69 6/ /69 6////69 6/ /69 6/[3/69 6/@/69 ann mais (an. Sa)

,,,,,,,,,,,,,,,,,c,,,

,,n,

__ _ _. _ _. -. _ _ _ - - _ _ -, _.. _....