ML19322B079

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amends 58,58 & 55 to Licenses DPR-38, DPR-47 & DPR-55,respectively
ML19322B079
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/16/1978
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19322B076 List:
References
NUDOCS 7911290600
Download: ML19322B079 (2)


Text

n 9.

o_ 3590-01 v

UNITED STATES i:UCLEAR REGULATORY C0!MISSI0ft DOCKET NOS. 50-269, 510,-270 Ai'D 50-287 DUKE POWER C0!'. patly T10TICE OF ISSUV:CE OF A!! fif."E'!TS TO Ft.CILITY d

06Tdi1MG L}CLISES The U. S. floclecr Regulatory Cc:.. :ission (the Ccamission) hcs issus.J Amendments Hos. 58, 58 and 55 to Facility Operating License hos. DPR-30, DPR-47 and DPR-55, respectively, issued to Duke Po.ter Company which revised the Technical Specifications for operation of the Oconee fluclear Station, Units !!cs.1, 2 and 3, located in Oconee County, South Carolina.

The c.cndments ere effectiw within 30 ys after tie dste of issu;nce.

These cmendunts revise the Technical Specifications Tabic 4.10-1 by adding shock suppressors and changing the classification of the location of certcin shock absorbers.

The application fcr the amand.ents complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (tne Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.

Prior public notice of these amendments was not required i

l since the auend.nents do not involve a significant ha:ards consideration.

The Com:aission has deten.1ined thct the issu:nce of these c:r.end=nts will not result in cr.y significant environmental impcct and that pursuant to 10 CFR 151.L(d)M) en enviren:natri iq:cct stot:: ant or negative decicration and anvironner,tal impact appraisal need not be pet;:artd in i

conne.:ction v:ith the issuance cf then caendments.

P00R O W A w

s

-_-.-._ x s d - -

mO 0, -)

j G

s s

i.

For further details eith respect to this action, sac (1) the application for amendo:cnts dated July 18,1977,(2) Amendment !;os. 53,

d 58 and 55 to License ilos. DPR-30, DPR-47 and DPR-55,. - ectively, and (3) the Cormission's iclated Safety Evaluation. All of these iter.is are availabic for public inspection at the Commission's Public Document Room, 1717 H Street,f!.W., Washington, D. C. and at the Oconee County Library, 201 South Spring Street, Walhalla, South Carolina 29691.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S.

Nuclear I':r,elttory Cornsion, llnhington, C. C.

295f 5, httenti:.c:

Director, Division cf Operating Ru;ctors.

Dated at Bett.esda, Maryland, this 16th day of February 1978.

FOR THE NUCt. EAR REGULATORY CO HISSIO!1 l

!k!!Lc'WlO-A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

~. _ _ _

-