RO 77-05/4P:on 770319,river Water Discharge Temp Differential Change More than 2 Degrees in 1-h.Steps Taken to Reduce Decay Heat Removal Load,Reducing River Water Temp Change
ML19322A440
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/20/1977
From: Colitz J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910250576
Download: ML19322A440 (1)


Text

O O

/ 55.$=L.

'y ~., ~ m LW u cswL r=1e E r.j

/

METRO?OLITAN EDISON COMPANY. sw c.ure crww.m= ummes-4re - .

,. r, ._.

POST OFFICE GOX 460 A88COLETOWN PENNSYLVANtA 17057 ~ TELEPHONE 717 9 54 4CM1 Farch 20,1977 D@@M O

Pr. J. P. O' Reilly Directorate or Peculate y OperationJ_... p[} ,' D _@"' '

Faqion I _ U g - {Q d 3

Nuclear Fegalatory Comission 631 Park Avenue I King of Prussia, .Eas:nsylvania 19406 _

Cberatina 1.icense DPP.-50 Docket 50-289 Subiect: Feoortable Occurrence fb. 77-05/4P Cear Mr. O'Fe111y:

This telegra' is to confirn the telecon between Mr. A. N. Fasano (Region I - TAC) and Pr. G. A. Kunder (T'il-1 Svoervisor of Operations) at 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br /> on 20 Parch 1977. j l

A violation of the Environmental Technical Specification ~ 2.1.b(2) occurred in that during the Routine Peactor Plant Cooldewn on 03/19/77, the river water differential te perature was chanced by rore than 20 in any cne hour. l The river water 6 was beino raintained at 00F t;o to the tire the Decay Feat Penoval Syster. was olated inservice at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />. As the Decay Fest Femval System was placed in service the river water discharge tero-erature began to increase causing an increase in the river water 6.

Since the Pechanical Craft Cooling Tower was operating at its full available '

capacity, i rediate steos were taken to reduce the Cecay Feat Fenoval beat load which in turn decreased the river water IT rate of0 chance. The river water 6 rate of change reached a rtaxirm of 3.5 F/hr. which exceeded I the specification.

The incident will be revie%ed and the results of the evaluation and any corrective action taken will be reported in the 14 day recort.

Very truly yours, G G 64{

r li f (J. 'J. Coli tt Unit I Sucerintendent Three Mile Island t;uclear Station JJC:11r 7910250 3'7 ol $