ML19322A040

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900509/78-05 on 781017-20 & Notice of Deviation
ML19322A040
Person / Time
Issue date: 11/06/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cleveland N
STONE & WEBSTER, INC.
Shared Package
ML19322A041 List:
References
REF-QA-99900509 NUDOCS 7901020065
Download: ML19322A040 (2)


Text

i g

[

4 UNITED STATES ys hg NUCLEAR REGULATORY COMMIS$40N

$.f c j

611 RYAN PLAZA CRIVE, SUITE 1000 2

o REGION IV 4

$[

c ARLINGTON TEXAS 76011

\\;'....f' 0 6 ?!0V 1973 Docket flo. 99900509/78-05 Stone & Webster Engineering Corporation ATTil: Mr. fl. B. Cleveland Vice President, Quality Assurance Post Office Box 2325 Boston, Massachusetts 02106 Gentlemen:

This refers to the QA Program Inspection conducted by Mr. J. R. Cr stello of this office on October 17-20, 1978, of your facility at Cherry Hill, tiew Jersey and to the discussions of our findings with Mr. C. fl. Reveliotty and members of your staff at the conclusion of the inspection.

Areas examined during the QA program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During this inspection it was found that the implementation of your QA program failed to meet certain flRC requirements. The specific findings and references to the pertinent requirements are identified in the enclo-sures to this letter. However, since corrective action and preventive measures were taken concerning these findings before the end of this inspection, no further written response to these items is necessary.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

790h0200 W

]

Stone & Webster Engineering Corporation Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, a

i 1

C@

Uldis Potapovs, C,hi Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900509/78-05 s

9 f'

9

)

-