Forwards Technical Review Rept AEOD/T801, Perry Nclear Power Plant Unit 1 Unexpected MSIVs Closure & Reopening. Results Indicate Event Is Plant Specific Case & That No Adverse Effects on Other Safety Sys Exist
ML19321D259
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/19/1988
From: Teh-Chiun Su
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Rosenthal J
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML19321D260 List:
References
AEOD-T801, NUDOCS 8904260125
Download: ML19321D259 (2)


Text

.

e4e23eeg 20:25 tRC RI DCOET ROOM NO.545 P011

'~?

perup stans P

NWOLAAR RBOULATUW 00MRM0010N

\\*e..')!

5 neemNI OEI O I W

^

esAu.aNinaasaa uneo or Pausen, posseevw.usA teses MEMDRANDUM FOR: W1111er T. Rase11 Regional Administrator FROM:

William F. Kane, Director Division of Reactor Projects

$UBJECT:

OPERATING PLAN FOR PEACH.30TTON IN5PECTIONS OURING RE5TART POWEP. TEST!M PROOP.AM The Peach Botton Atomic Powar Station ins been shutdown since Narch 1987 to make substantial improvements to station culture and operator attitudes and to improve management.

PEco is preparing to undergo an extended power ascension test program, pending restart approval by the NRC. The Commission i s sched-91ed a meeting to vote on the restart of the station on April 17, Sg ud, if authortied to restart, the licensee intends to commence tw power ascension program immediately thereafter. Region I has recomunended that the facility be permit:.ed to restart based on an extensive inspection and review program to independently review the improvements made to the facility and its management to date.

During implementation of the power ascension prcgram for Unit 2, the NRC has committed to substanital inspection coverage of the facility, including round-the-clock inspector coverage of key safety significant plant evolutions.

Enclosed is the proposed operating plan describing the Region I augmented inspection progran:, a Division of Reactor Projects temporary organization change, and the delegation of authority for NRC oversight of thir Peach Bottom restart activities. General cuidance and specific instructions for fsplemen-tation of the augner:ted inspei:tion program are also included in this plan. The i

licensee predicts that the restart activities and the power ascension program, which includes three holdpoints requiring your release prior to proceeding, will take about four amnths to complete. The augmented ing/ection program will remain in effect until completion of the power ascension prograc.

Vi ntan F, nne. Director Division of Reactor Projects oprov Disapproved:

r 2d William T. Russell

~

Regional Administrator

Enclosure:

As stated CONTACTS: James C. Linv111e Thomas p. lohnson 346-5122 (717) 456-7614 (Peach Botton) c10%botser~

Cp}y. f cP p ooc7c 0 t

" - - - - - - - ~ - - ~ ~ - - ~

. ~. -

-04/13/B9 20:25 tRC RI DCOGT ROOM to.Ex3 pa12 Memorandum for William T. Aussell 3

M,4 7 W s

cc w/enc1:

8. Boger, NRR R. Martin, NRR

$. Varga, hRR J. Roe, NRR B. Clayton, EDO S. Collins, RI E. Wenzinger, RI M. Knapp, RI T. Martie. RI R. Bellaar, RI J. Dure, RI R. Gallo, RI H. Williams, RI J. Linville, RI J. Gadrala, RI Y. Johnson, SRI - Peach Bottom R. Urban, RI - Peach Bottom L. Nyers, RI - Peach Bottom F

ir 4

  • g,,y,--w,,y-w w r

-g,w-w,,v,-,,vem w y e,w e y-a m

e-

--- mm-------- - --------

B4/13/09 20
25 IRC RI':DOCKET RODr1 NO.545 P013 e

l

.~

1 a

l h

I i

OPERATDEi PLM PEACH BOTTOM RESTART INSPECTIONS DURING THE F0WER ASCENSION TESTING PROGRAM I

i h

r s

+

w f

i e

4 I

e 4*

-,,,. -. - -,., - - < ~,. -,,,

e4/13ees 20:25

@C R1 DCCKET ROOM NO.545 P014 1.

Introduction The Regten I augmented inspection program for the Peach" Bottos Unit 2 restart effort during the power ascension testing and taittal plant operations as well as the special organization which is responsible for conducting onsite inspections of licensee restart operations durin) this period is modeled after the TMI-1 restart program of 1985 and the Pilgrim restart program of 1988.

This operating plan provides both general guidance end specific instructions for implementation of the Peach Bottom Restart $taff inspection activities.

2.

Puroose The Peach Bottom Restart Staff was established to suustantially augment the normal NRC resident and regional inspection activities (1) to provide increased NRC awareness and understanding of the safety of peach Bottom startup operationr (2) to provide timely NRC staff response to operational problems or events that may occc-during this period, and (3) to provide a sound technical basis for deters.. :ing the effectiveness of licensee management controls for safe facility operation. All NRC staff and con-tractor personnel assigned to the Peach Botton Restart Staff should become familiar with the guidance and instructions in this plan so that these

~

objectives are attained.

3.

Organization The organization of the Peach Bettom Restart Staff is depteted on the attached organization chart (Attachment 1). The Restart Staff will be headed by the Restart Nanager who will be supported by an Adeinist.'4tive Assistant.

The Restart Staff will consist of qualified insp6ctors from the peach Bottom Resident Office, the Region I Divisions of Reactor Projects, Reactor Safety, and Radiation Safety and Safeguards, the Office of Nuclear Reactor Regulation and resident inspectors free other sites. NRC contractors

~

will be used as needM,. The total staff size will vary dependtag on the licensee activities to be reviewed and will be organized and coordinated by the Restart Manarer. An inspection assignment schedule will be provided s

to the Restart $taff at a later date by the Restart Manager.

4.

Infot.aation Flow Proper and effective communication of both routine and problem-related information obtained by the Peach Bottos Restart $taff personnel during their inspection activities is essentisi in assuring appropriate NRC foi owup actions and evaluations of the Power Ascension Program. Most inspection or monitoring activities conducted during the Peach Bottoa startup program will be pre planned, based on the antteipated facility operations.

In some cases, designated region-based inspectors will be dispatched to the site to observe selected startup tests or to take measure-ments during certain changes in plant operation. Therefore, any changes j

i

id ea,13,e9 20:25 tRC Ri DCOET ROOM to.545 P015 Operating Plan for Peach Bottos 2

Res.tart During Power Ascension Testing to planned licensee activities or oNrational problems that could poten-ttally impact the licenstee's test schedule should be brought to the atten-tion of the Peach Bottom Restart Marager as soon as possible. Any safety concerns, apparent or potential violations of regulatory requirements, or items of stallar significance should be promptly conveyed to the Peach Botton Restart Manager after the matter has been identified to the approp-riate licensee representative (Shift Supervisor, Shift Manager or Operations Superintendent).

Events reported to the shift inspector can be classified generally into two categories:

(1) those for which an EWS call was made such as for 10 CFR 50.72 reports which include energency plan classified events, and (2) those that are regulatcry in nature (10 CFR 20,10 CFR 50.73, etc.) or for information only (such as itees of potential public interest).

Within the scope of those events that do not require an ENS call, there may well still be a safety signtficant event and thus require attention on the part of the NRC.

Safety significant events. ENS calls, and items of potential public interest will be reportec to the Peach Bottom Restart Manager as soon as reasonably pcssible.

The Peach Bottom Restart Manager will inenediately report safety significant events and ENS calls to the responsible Region ! DRP Section Chief or, if unavailable, the DRP Branch Chief or Director.

The Restart Manager will also evaluate the need to report itelns of potential public interest to the ORP Section Chief.

All reported events within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> will be discussed at the 7:30 a.m. morning meeting (discussed 3

in Section 7 of this report).

i External dissemination of this information will be conducted using existing communication esthods (morning report, EDO daily Melights, preliminary notifications, press releases, etc.).

NOTE:

Licensae notification of an egent to the shift inspectors of the Restart Staff does not relieve the licensee of its reporting responsi-bilities under 10 CFR 20, 21, 50, 72 and 73.

  1. 5.

peach Botton Restart Staff Insoections Throughout the initial period of Peach tottom restart operations, all onsite inspections will be coordinated by the Peach Gotton Restart Manager and con-ducted in accordance with an integrated inspection plan approved by the DRP Branch Chief.

These inspections inc?ude those conducted by (1) the rest-j dent inspectors. (2) the Region I-Y/NWNRC contractor shift personnel, (3) the region-based project inspectors, and (4) regional specialists.

The inspection observations, findings and enforcement actions in these areas will be documented in a consolidated inspection report. The Peach Bottom Restart Manager is responsible for preparing and maintaining current app opriate inspection plans.

The Administrative Assistant for Peach Botton Restart is responsible for coordinating preparation of the con-solidated inspection report.

In addition, periodic status reports will continue to be issued to keep NRC senior management and the public informed as to the pregress of the restart effort.

fm. o h

04/D/89 20:25

@ C RI DCO GT m to.545 P216 Operating Plan for Peach Bottom 3

hastart During Power Ascension

. Testing 6.

$hift Inspection Coverage

~

<j-The Peach Bottom Restart Staff will be augmented by SWR experienced in-spectors as well as NRC contractors as the need exists. These individuals l

will be assigned to observe the condu:t of control room operations and licensed activities performed in certain other plant areas. Specifi-inspection/observation iten,s will be pre planned, to the extent practi-cable, in conformance with a pre-established inspection plan.

The expected i

shif t coverage assignments will be shown ty separate memorandum. An i

overview of the inspection coverages for key plant evolutions is shown as Attachment 2 to this plan. Each person providing shift coverage nor-mally will be assigned to work a designated 8-hour period for seven con-i secutive days (Monday through Sunday).

The typical shift inspection periods will be 7:00 am - 3:00 pm, 3:00 pm - 11:00 pm and 11:00 pm -

7:00 am, cenststent with the licensee's shif t schedule. The shift inspec-l ter is expected to be required to work as much as 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per day to pro-viel: pre-shif t turnover (approximately 1/2 hour), shift inspection cover-age (8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />), and post-shif t documentation (approximately 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />).

A specialist inspector will be assigned in accordance with attachment 2 to eenitoe testing activities and to review test results during initial criticality and low power testing.

Inspection support from the regional technical divisions will be requested, scheduled and planned at the earliest possible date, commensurate with the evolution of the power ascension schedule.

prior to the first assignment on shift coverage, each shift inspector will be provided a half day period for:

site specific training and access processing, an orientation to licensee administrative procedures and con-i trols including work control procedures and the Peach Bottom daily routine, j

site organization, plant layout, plant systess and the Technical Specift-caticns, and an observation period in the control room. The site-specific training and access processing assumes the individual is certified as trained in basic radiation protection. During this orientation period, certain documentation will be available for inspector self-study and general familiarization.

i 7.

Inspection Documentation All Peach Sotton Restart Staff inspection activities are intended to be conducted in accordance with a pre established inspection plan.

The inspection plan will identify specific items to be reviewed or observed by designated individuals based on the licensee's scheduled startup activ-j ities, including major system functional testing, expected changes in operating modes and planned reactor trips.

The plan will be updated daily based on anticipated near-ters restart test operations and general plant operations as detemined by Restart Staff members during licensee pre-shif t briefings, daily operations meeting, test planning asetings, Plan-of-the-Day (Tripod) meetings, or similar contacts with licensee represen-tatives.

The inspection plan will be prgparpd by the Pear.h Anttom testart Manager anc approved by the responsible DRP tranch Chief on or before the start 'of the pre-established inspection period.

. ~.

04/13/89 20:25 tRC R1 DCOET ROO1 to.545 P017 Operating Plan far Peach Bottes 4

Restart During Power Ascension

. Testing While assigned to shift covierage, each NRC inspector/contractor will maintain a shift Inspector's Log. The purpose of this log is to record routine inspector observations and all significant findings or potential safety concerns.

The log should indicate the disposition of identified concerns by the licensee and NRC Peach Bottos Restart Staff rept-esentatives and should identify all significant information exchanges.

Licensee documents listed in the log shou:d be identified ir. :(:fficient detail (procedure or record number, title, revision, issue date and completion date) for subse-quent reference in the inspection report.

Each inspector is responsible for preparing romplete inspection report input documentation prior to the end of his/her last day onsite during the inspection period.

The input documentation shall include a draft inspection feeder report, statistical inspection data (766) form input, SALP input (positive and negative findings), ant draft enforcement citations and outstanding items list input (if appropriate). Issues identified but not resolved by a shif t 'nspector will be passed to a cognizant staff inspector for followup as determined by the Restart Manager. The staff inspector will then bear the responsibility for preparing ti,e inspection feeder report on that issue. The Administrative Assistant for the Peach Bottom Restart Staff will coordinate final inspection report preparation, typing and management review 50 that the report is issued in a timely manner.

i The inspection report forstat and content will vary fram m6nth-to-month dependent on the nature of the licensee activities reviewed. However, the following major report sections/paragraphs may be included in the final report:

General overview/description of NRC personnel participants in the inspection, ongoing plant operations and the scope of NRC inspection activities, significant contacts with licensee representatives, significant restart silestones (including all NRC hald points) com-plated and a summary of operational events that occurred during the inspection period.

Chronological summary of plant operations.

Operational event assessments (if appropriate).

Shift operations includf ag logs and records review and facility monitoring (management planning and direction, conduct of operations and interface effectiveness both on shift and across functional organizations). Both objective and subjective observations and findings.

Surveillance testing activities.

1 Maintenance activities.

1 Assurance of Quality, including management oversight of operations

[

and licenses self assessment activities, t

t I

1 I

.-m,

.~... ~ -.

~..w 0.

04/13/89 20:26 tRC RI DCCKET ROOM NO.545 P010

.e Operating Plan for Peach Botton 5

Restart During power Ascension

' Testing

{

i Engineering and technfi:a1 support for the startup effort.

)

Startup testing review.

i Radiological controls/radioactive waste operations.

3 Security program activities.

Licensee assessment activities.

Previous inspection findings.

8.

General Information and Guidance This section contains information and guidance that describes policy, operating guidelines and routine instructions that are applicable to Peach Bottom Restart Staff practices.

t A staff briefing and planning meeting will be conducted each weekday at 7:30 am to review both recent and near-term Itcenset startup i

activities and facility operations. This meeting should be attended by all currently assigned Region I Peach Botton Restart Staff members and the off going (11:00 pm - 7:00 an) shift inspector. The on-shift inspector may attend if the individual is not following specific activities.

Immediately following this meeting, the Peach Bottom Restart l

Manager will conouet a telephone briefing with the responsible DRP l

Section Chief.

An EDO Daily Highlight Report or a Morning Report will be transmitted to Region I, as required, by 8:30 am. The off-going (11:00 pm -

7:00 an) shift inspector is responsible for preparing the first draft of these reports prior to 7:30 as.

l

~

The duty shift inspector normally is expected to remain onsite during the entire shift period. Because routine day shift activities out-side the Control Room would be covered by resident inspectors or Regional specialists, the 7:00 am - 3:00 pu shift inspector should i

remain within or nearby the Control Room. Other shift inspectors should spend their time about equally within the control room and other plant areas.

There are no specific restrictions regarding when Restart staff members may take meal breaks; however, off-site meals should be j

planned during periods of low test activity. Onsite vendor/canteen food is normally available.

j i

All public inquires and media requests for status/interviews shouh be referred to the Peach Botton Restart Manager. All allegations should be reported promptly to the Restart Manaper and relayed to the DRP Sectice '.1ef.

Inspection activities in fo l1ovup to allegations shall not be conducted by the inspecurs until direction is given by the Restart Manager.

e

- w er.

--4r r sm* w +w

_ _ w eree-=r w-m eereia-we ev a e et e- +rm-e,s

-saw -\\ serse sec-+-

W WP-ee--w<,rw*-s'--

e=

.maw ar w i>+, = w w e-ee-newrsm--

,-%- - - e me *ie-*

r e

04/13/89 20:2ci tRC RI DCOET RDOM NO.545 P019 i

Operating Plan for Peach Bottom 6

Restart During Power Ascension Testing Three hold point release (startup contieustion) memoranda will be sent to the Region 1 Regional Administrator from the Director,-

DRP.

These memoranda will provide th6 justification and bases for permitting startup testing to be conducted up to the next hold point.

The criteria for each specific hold goint release will be developed by the Restart knager and formally approved by the DRP Branch Chief.

The Peach Bottom Restart knage-is responsible for coordinating the format, content and preparation for each hold point release memorandum.

A Periodic Status Report will continue to be prepared. That report will describe the major testing accomplishments, significant operational problems or events a.nd similar items of general interest.

The report preparation will be coordinated by the Peach Bottos Restart Manager.

i The Peach Bottom Restart Staff response to events/emergency situations is described in the NRC Region I Incident Response Plan with the Restart Manager fulfilitng the role cf the Senior Resident Inspector.

All Restart Staff personnel should be familiar with the general provisions and their specific emergency responsibilities as described in that plan.

As described in the plan, the Restart Manager will function as the senior NRC official onsite in the event of an emergency until properly relieved by the NRC $1te Team. The Plan will be available in the Peach Bottom Resident Offict 9.

Provisions for Observation of the Restart Staff Insoections by Representatives of the Commonwealth of Pennsylvania and the State of Marylanc The Commonwealth of Pennsylvania and the State of kryland have expressed a continuing interest in the activities at the Peach Bottom station and may request to accompany the inspectors of the Restart Staff.

Provisions for accompaniment of the Restart Staff inspectors by repretentatives of by the DRP Director and the Region I $tate Liaison Dffic e-the Regional Administrator. The Restart Staff inspectors will be briefed by the Restart $taff Manager on the formal protocols for any arrangement made with the $tates.

Attachments:

1.

Peach Botton Restart $taff Drganizatica 2.

NRC Inspection Coverace During the Restart Power Testing Prograe 1

3.

Peach Botton Restart Power Testing Program M

1 3

04/a3/e9 20:26 NRC RI DCOGT RODf1 to.545 P020 i

A':tacimen': '

i

  • EAC-B0 "'0M R ES"AR" S"A r ORGAN ZA" 0N I

1

{

DIRECTOR DM310N OF REACTOR PROJECTS i

REGION 1 i

1 BRANCH CH!EF DRP 2 I

SECTION CHIEF DRP 2A s

i I

PEACH BOTTOM i

l RESTART MANAGER,

N IADutN!STRATIVE ASSISTMC PEACH BOROM RESIDENT FOR PEACH BOTT0W RESTART

  • NSPECTON STAFF

=J Rttl5DT1BRUf5ltS l

RESIDENT CLERICAL A!DE DRP PROJECT INGINEERS j

i oRp REACToR ocatERs 2

REGION 1 SPEclALISTS PEACH 90TTOW OPERATIONS l

(osrocuired)

SHIR NSPECTORS i

t PLAta OPERATIONS DAY (7:00 om 3:00 pm) l i

STARTUP TESTNG i

RADIOLOGICAl. CONTROLS EVE (3:00 pm 11:00 pm)

SECURITY MID (11:00 pm 7:00 cm) l

p ri n s 20:26 tRC R1 DOCKET RO31 WM N

4

~.

ATTACMDIT 2 NRC Inspection Coverage During the Restart Power Test16g Program Estimated Reconnended Documentation Duration of Coverage Level Required Evolution (See Note 2)

($ee Note 3)

Restart Key Event (hours)

Resident Shift* Specialist 1.

Commission Vote N/A 0

0 1(DRP)

Rec la. Respond to Staff 0

0 1 (DRP)

Rep Requirements Memo 2.

Precriticality Checks 30 2-3 0

0 1

(Observation level to be decided at a later time) 3.

Startup (364 total/minimum) 3a. Shutdown Margin 3

2 3

1(DRS)

36. Rod Pulls and SRM/IRM Checks 4

2 3

1(DRS)

EDO 3c. Training Startups 48 2

3 0

P 3d. RX Chemstry 8

2 3

0 1

3e. Raise Pressure to 150 psig 4

2 3

0 P

3f. Test RCIC/HPCI at 150 psig 27 2

3 1(DRS)

P 3g. Raise Pressure to 450 psig 12 2

3 1(DR5)

P 3h. Complete 450 psig Testing 43 2

3 1(DRS)

P

31. Complete Drywell Inspection 8

2 3

1 (DRS)

P JJ. Heatup and Testing at Rated 350 2

3 1(DRS)

P Pressure 3k. Contingent Shutdown 56 2

3 0

P

31. Mode Switch To Run 1

2 3

0 D

4.

355 Power Escalation (965 total/minimum)

Aa. katse Power to 15-205 8

2 3

0 EDO 4b. Roll Turbine/Phase 25 2

3 0

P Generator/Testing 4c. RCIC/HPIC DP Testing 48 2

3 1 (DRS)

P 4d. Generator Testing at 205 11 2

3 0

1 4e. Ramp Power to 30-35%

4 2

3 0

P of. CRD Time Test 10 2

3 0

P 4p. Various RX Tests 176 2

3 0(DR$)

1 P

4h. Management Assessment/

4 Weeks 2

3 I

Normal Operations (kelax to resident coverage 35%

after 48 hrs - see note 1) 41 Contingent Turbine Trip 11 2

3 O

P

7 04/13/89 20:26 tRC R1 DOCKET ROOM NO.545 P022 t

)

1 5stimated Recossended Documentation Duration of Coverage Level Required Evolution (See hote 2)

(See Note 3)

Restart Key Event (hours)

Resident Shift* Specialist 5,

105 Power Escalation (582total/ein)

I Sa. Power Escalation Tests 100 2

3 0

EDO 5b. Transient Testing 78 2

3 0

P l

Sc. Operator Training Program 68 2

3 1(DRS)

P 5d. Management Assessrent/

2 Weeks 2

3 0

I Normal Operations (Relax to resident coverage P

after 24 hrs of steady state 70%

operation) 6.

100% Power Escalation (454 total/min) 6a. Power Escalation Tests 118 2

3 0

EDO 6b. Management Assessment/

2 Weeks 2

3 0

I Normal Operations (Relax to resident coverage P

after 24 hrs of steady state ORD operation)

NOTE 1 Relaxstion of shif t coverage will be recommended by the Restart Manager through the Section Chief and Branch Chief and approved by the DRP Director.

NOTE 2 One week radiological controls inspection is assumed to occur during plant startup.

i.-

One week radiochemistry/effluent inspection during plant startup.

One week security inspection during plant startup.

NOTE 3 Documentation Codes:

Roc - Staff Recommendatten Rep - 5taff Reply to Comets:1on 1 - Inspection Report D - Daily Report EDO - EDO Highlight P - Periodic Status Report 5 - Release from X4 Memo ORD - Order Release

'Shift coverage may include a resident inspector.

1

..Y" ATTAD MIIT 3

,.h-DBAPS RES~ART -POW R ~ ESTING: (UMT 2)

[L t asstssutw or PERf00S Or PERFORMANCE t,e or OBSERVAIlON & IRAINING g

100-b asstssutw orsrtaer-stait erwom ct b' vaasar/stsrmc nams

,, m " ' "e. ", -

g

  • i n,/

\\

SICADF-STAR g

W 8EIC APMIOWI4, PCs,f sif8Dr-ifaff PT8mf's l

08bE8'AN04 3.

\\ V..

SQ ~

~

.,,O _,_, _

e E

c k

  1. E t a5 1r-STA,C i

f I

y so -

y j = = ' = _...i _... l..

l l

l l

f

"'",=ctm wracts E

A 40 q

\\

.s g j.

j.

w - n 7,.gs; p,,,,,,,, g h j

i g lf KSIW C l NEvirn lSEADr-5,a90 castsyn,eoes.

l

,I l

l l

. i. - - i

_ ----.. :._._ i 20


i -

i 1

6 T *'

. vi i..l.

._. L.

wto -

i w !R ~ / [i

!l Il ll 8

5:

250-i 0

ni inin ninin niii,,i...!.. n i i i i n, i i i nnn i r,, i i i i i i i i i i i,,,,,, i i,1,, i,, i, i i i, i,,,,,,,,,,,,,,,,

e

[

1 2

3 4

5 6

7 8

9 10 11 12 13 14 1s WE.EKS I

1

. - -, _...