OPERATING DATA REPORT DOCKET NO. 050-298 DATE July 1, 1980
- a COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS N tes Cooper Nuclear Station
- 1. Unit Name:
June 1980
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (51Wt):
836
- 4. Nameplate Rating (Gross 51We):
778
- 5. Design Electrical Rating (Net MWe):
660
- 6. Slaximum Dependable Capacity (Gross 31We):
' '2 5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Turbine modifications to recove cracked turbine discs and to replace turbine blades and discs with pressure controlling baf fle plates resulted in reduced generating capacity
- 9. Power Lesel To Which Restricted,if Any(Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to Date Cumulatise 720.0 4.367.0 52,608.0
- 11. Hours In Reporting Period 658.3 2,105.3 43,342.6
- 12. Number Of Hours Reactor Was Critical 0.0 o,o 0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line 616.7 2.054.4 42.5?0.0 I5. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thennal Energy Generated (MWH) 1 911 nAt_n a 909 %at.O on 6 71_ 41 n n
- 17. Gross Electrical Energy Generated (MWH) 329.828.0_..
1.348.023.0 25.886.871.0 IS. Net Electrical Energy Generated (MWH) 315,966.0 1,297,094.0 24,955,371.0 85.7 47.0 80.8
- 19. Unit Service Factor
- 20. Unit Asailability Factor 85.7 47.0 80.8 69.1 46.8 74.7
- 21. Unit Capacity Factor (Using MDC Net) 56.4 38.2 61.0
- 22. Unit Capacity Factor (Using DER Net) 2.7 2.0 4.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
None i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed I
INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIA L OPER ATION 8007250 N {
.=
.~
O 050-298 I)OCKET NO.
UNI SilulDOWNS AND POWElt REDUCllONS UNII~ N AME Conper Huclea.r Schtion DAIE July 1, 1980 COMPl.ETED llY P.
1..
Ital 1 i nster itEPOlt I MON 111
. Tone l El.EPilONE 402-8'15-3811 a
5 E
{g
'h j []
Licensec
, -r, 59,
. Cause & Co icctive E
Actiim to
. No.
Date g
3g 4
35E Event 3,y po vi U Prevent itecurrence f3 5
- p, Itepint a g
H 6
80-5 800301 S
85.9 C
2 NA NA NA 1980 Refuelin'g and Maintenance Outage 80-6 800604 F
17.4 A
3 NA NA NA Reactor scram frota low reactor water level following reactor feedwater pump overspeed trip. Malfunctioning reactor feed pump controller problem was corrected and reactor returned to operation.
80-7 800622 S
0 11 NA NA NA NA Power was reduced to allow adjustment of the control rod pattern.
i 3
4 I
2 Method:
E31ubit G. Instinctions 1: Forced Itcason:
1 -M.m aal foi Picparation of Data S: Scheduled A ! <luipment Failure (Explain) ll. Maintenance of Test 2 Manual Scram.
Entiy Sheets Im I.icemee 3 Automatic Sciam.
1: vent Itepost (l.1:11) lide INUltl&
C Itefuctmg D-Itegulatory llestriction,
4 Othes (Explain) 0161) 1 -Opciator Tsaining A 1.icense IIxamination 5
I. Administrative 1:shibit I SJme Soutec G. Operational he Her (f.xplain) s p:/77)
Il Othes (limplain)
.s 4
...