ML19321A908

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/80-11 on 800527.No Noncompliance Noted
ML19321A908
Person / Time
Site: Farley 
Issue date: 06/10/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19321A909 List:
References
NUDOCS 8007240369
Download: ML19321A908 (2)


See also: IR 05000348/1980011

Text

-.

. - . .

-

.-

-

Tk

&

/

'o,,

UNITED STATES

dS

8

NUCLEAR REGULATORY COMMISSION

o

5

g

<r

REGION 11

o

101 MARIETTA ST N.W SUITE 3100

Y

ATLANTA, GEORGIA 303o3

g.....o

In Reply Refer To:

JUN 101980

RII: RET

50-348/80-11

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by R. E. Trojanowski of this office on

May 27, 1980 of activities authorized by NRC License No. NPF-2 for the Joseph M.

Farley Nuclear Plant facility, and to the discussion of our findings held with

J. Woodard at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report wili be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincer

y,

^

W

/

i

J. Philip Stohr, Chief

lg Fuel Facility and Materials

Safety Branch

Enclosure:

See Page 2

.

L

...

-

.

- . . _ _ _ . - - . -

.-.-

-.

--

a

\\

Alabama Power Company

-2-

JUN 101980-

.

Enclosure:

Inspection Report No. 50-348/80-11

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

l

Post Office Box 2641

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

0. D. Kingsley, Jr.

Manager, Nuclear Engineering and

Technical Services

P. O. Box 2641

l

Birmingham, AL 35291

J. W. McGowan

Manager-0perations Quality Assurance

P. O. Box 2641

l

Birmingham, AL 35291

i

j

W. G. Hairston, III

l

Plant Manager

l

Drawer 470

!

Ashford, AL 36312

l

.

'

!

r

l

.

-

i

r

!

l

'

,

f

ks.