ML19321A881
| ML19321A881 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/08/1980 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 8007240330 | |
| Download: ML19321A881 (2) | |
Text
_
l
.s g 4 [f1 b,
UNITED STATES e
g NUCLEAR REGULATCr7Y COMMISSION
.E WASHINGTON, D. C. 20555 s
'I
%.... /
JUL 0 8 030
+
Docket No. 50-266/301
' Mr. Sol Surstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201
Dear Mr. Burstein:
On April 28, 1980, the Office o' Nuclear Reactor Regulation was reorganized.
As a result of that reorganizr, son, a number of changes have been made in office titles, positions, and assignments of personnel. For your convenience, the following information is provided for Point Beach Nuclear Plant, Units 1 and 2:
Harold R. Denton, Director, Office of Nuclear Reactor Regulation Darrell G. Eisenhut, Director, Division of Licensing Thomas M. Novak, Assistant Director for Operating Reactors Robert A. Clark, Chief, Operating Reactors Branch No. 3 Charles M. Trammell, Project Manager (301-492-7070)
Philip C. Wagner, backup Project Manager (301-492-7071)
Sincerely,
% D 2:
Thomas M. Novak, Assistant Director for Operating Reactors Division of Licensing, NRR cc: See next page 8007240330
~
Mr. Sol Burstein Wisconsin Electric Pcwer Conpany cc: Mr. Bruce Churchill, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Docucent Department University of Wisconsin Stevens Point Library Stevens Point, Wisconsin 54481 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Conpany Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washing on Avenue Madison, Wisconsin 53703 1
w