Responds to IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. All Welds Examined & Found to Be Clear of Recordable Indications
ML19321A249
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/27/1980
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-145, IEB-79-17, NUDOCS 8007230076
Download: ML19321A249 (1)


Text

- _ -_ - ___.

nl 4

TOLE 00

%m EDISON June 27, 1980 I,"[$ cam N***

Docket No. 50-346

" 'S'858 522' License No. NPF-3 Serial No. 1-145 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter is in response to IE Bulletin 79-17, Revision 1, dated October 29, 1979 (Log 1-262), as applicable to Davis-Besse Nuclear Power Station Unit No. 1.

Welds identified in Toledo Edison's letters (Serial Nos. 1-106 and 1-127) dated November 28, 1979 and April 29, 1980, respectively, have been examined visually per item 2(a) and volumetrically per item 2(b) in accordance with the requirements of IE Bulletin 79-17, Revision 1 and Babcock & Wilcox procedure ISI-129, " Ultrasonic Examination for the Detection of Intergranular Stress Corrosion Cracking "IGSCC" in Stainless Steel Piping", Revision 4.

All of the welds that were examined were found to be clear of recordable indications. As a result of these inspections, no further actions are required.

Yours very truly,

/N RPC:I%DI bj b/1 jura 601980' i