Forwards IE Insp Rept 50-341/80-06 on 800430,0501,02 & 28-30.No Noncompliance Noted
ML19321A241
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/17/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19321A242 List:
References
NUDOCS 8007230059
Download: ML19321A241 (2)


See also: IR 05000341/1980006

Text

-

TlC

pa ng:

UNIT ED ST ATES

+

NUCLEAR REGULATORY COMMIS510N

f

S

REGloN ill

,

B

f

799 ROOSEVELT ROAD

'(

/

GLEN ELLYN. ILUNOIS 60t M

IJUN 17 880

Docket No. 50-341

The Detroit Edison Company

ATIN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Mr. P. A. Barrett of this

office on April 30, May 1-2 and May 28-30, 1980, of activities at Enrico

Fermi Nuclear Station, Unit 2, authorized by NRC Construction Permit No.

CPPR-87 and to the discussion of our findings with you and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

Specific commitments concerning your design chanbe control programs are

addressed in this report under Licensee Action on Previous Inspection

Findings - - Item 341/79-17-02.

If you believe the commitments as written

to be in error, you should notify this office in writing within twenty

days of your receipt of this letter.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows. If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

l

withhold such information from public disclosure. The application must

j

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure

to the application.

8007230Off

a

.

.

2-

'o

Detroit Edison Coapany

-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,-

t

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure: IE Inspection

Report No. 50-341/80-06

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

e

.,

,

-

, , -

-

_

. , . - - -