ML19321A241
| ML19321A241 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/17/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19321A242 | List: |
| References | |
| NUDOCS 8007230059 | |
| Download: ML19321A241 (2) | |
See also: IR 05000341/1980006
Text
-
TlC
pa ng:
+
NUCLEAR REGULATORY COMMIS510N
f
S
REGloN ill
,
B
f
799 ROOSEVELT ROAD
'(
/
GLEN ELLYN. ILUNOIS 60t M
IJUN 17 880
Docket No. 50-341
The Detroit Edison Company
ATIN:
Mr. Edward Hines, Assistant
Vice President and Manager
Quality Assurance
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
This refers to the inspection conducted by Mr. P. A. Barrett of this
office on April 30, May 1-2 and May 28-30, 1980, of activities at Enrico
Fermi Nuclear Station, Unit 2, authorized by NRC Construction Permit No.
CPPR-87 and to the discussion of our findings with you and others of
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
Specific commitments concerning your design chanbe control programs are
addressed in this report under Licensee Action on Previous Inspection
Findings - - Item 341/79-17-02.
If you believe the commitments as written
to be in error, you should notify this office in writing within twenty
days of your receipt of this letter.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows. If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
l
withhold such information from public disclosure. The application must
j
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary in-
formation identified in the application is contained in an enclosure
to the application.
8007230Off
a
.
.
2-
'o
Detroit Edison Coapany
-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,-
t
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure: IE Inspection
Report No. 50-341/80-06
cc w/ enc 1:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr.,
Attorney