Text

._

O v

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900089/60-01 Program No. 51300 Company: Huico Incorporated 724 Taylor Road Merridian, Idaho 83642 Inspection Conducted: May 5-8, 1980 Inspectors:

1

/

N17 AC V /. H. Hunter, Contrlctor Inspector Date '

/

ComponentsSection I Vendor Inspection Branch Approved by:

bf/

2786

. E. Whitesell, Chibf

[

D'ata '

CcmponentsSection I Vendor Inspection Branch Summary Inspection on May 5-8,1980(99900089/80-01)

Areas Inspected:

Implementation of 10 CFR 50, Appendix B criteria including action on previous findings, training, audits, and calibration.

The inspection involved twenty-eight (28) inspector-hours on site.

Results:

In the four (4) areas inspected there were no apparent deviations or unresolved items identified in three (3) areas. The following apparent deviations were identified in the remaining area.

Deviations: Audit Control; (1) Department Heads do not include che probable couse or effective date of corrective action in their response to adverse findings (See Notice of Deviation, Item C.); (2) One (1) QA supervisor audits functions for which he supervises (See Notice of Deviation, Item A.); and (3) The QA Manager does not maintain a log for audit reports, follow-up action and re-audits (See Notice of Deviation, Item B.)

All of the above deviations were contrary to the requirements of Criterion V of Appendix B to 10 CFR 50 and Section 18.0 of the ASME accepted QA manual.

l l

l 1

8o07220/i5' l

2 4

General Infomation:

It was noted that the position of the president of Huico at the Corporate offices in Seattle, Washington has been transferred to the Huico facility in Boise, Idaho. Mr. D. Church has been appointed as president.

i

-~--7,,.

.---e

3 DETAILS SECTION A.

Princ cal Persons Contacted D. Church - President

  • K. Han - Vice President
  • D. D. Volkman - Quality Assurance Manager
  • R. V. Olson - Director of Engineering
  • P. W. Sly - Director Corporate Quality Assurance
  • J. Harper - Procurement Manager
  • J. Freeman - Superintendant
  • N. W. Seid - Senior Welding Engineer
  • L. E. Garrison - NDE Supervisor Level III B.

Action on Previous Insoection Findinas (Closed) Deviation (Report No. 99900089/79-01): Welder qualification records - It was verified that all weld performance qualification records had been reviewed.

In addition, a schedule for a periodic review of the weld engineering files has been established to assure compliance with the QA manual.

(Closed) Deviation (Report No. 99900089/79-01): Welding not performed per procedure - It was verified that:

(1) the affected weld had been cut out, (2) the responsible welder and inspector attended special training sessions, and (3) that comparison sheets attached to the weld machines have been simplified in order to eliminate errors when checking volt and amp meters during welding.

C.

Audit Control 1.

Objectives The objectives of this area of the inspection were to verify that procedures had been prepared and approved by the vendor that pre-scribed a system for auditing which is consistent with the commit-ments of the ASME accepted Quality Assurance Manual. Also, verify that these audit procedures were being procerly and effectively implemented by the vendor.

2.

Method of Accomplishment The objectives of this area of the inspection were accomplished by:

a.

Review of the ASME accepted Quality Assurance Manual, Section 18.0, titled " Audits" to verify that procedures had been estab-lished to prescribe a system for auditing.

4 b.

Review of the following documents:

(1) Current audit check list (2) Current audit schedule (3) Audit personnel qualifications to verify that they had been prepared by the designated authority, approved by management, and reviewed by quality assurance.

c.

Review of selective audit reports to verify that they identify the written plan, team selection, team orientation, audit noti-fication, pre-audit conference, audit performance, and post-audit conference.

d.

Review of randomly selected audit reports to verify that the distribution to management, and the audited organization, and follow-up regarding corrective action had been accomplished.

e.

Review of internal and external audit reports to verify that the applicable procedures were available to the audit team personnel, and that the audit procedures were properly and effectively implemented.

3.

Findings a.

Deviation Refer to Notice of Deviation, Items A, B, and C b.

Unresolved Items None were identified.

D.

Calibration 1.

Insoection Objectives The objectives of this inspection were to:

a.

Ascertain that a system has been established and is maintained to assure that tools, gages, instruments and other measuring devices used in activities affecting quality are properly con-trolled, calibrated and adjusted at specified periods to main-tain accuracy within specified limits.

5 b.

Verify that the system described in (a) above, has been adequately documented with approved procedures and that these procedures are being implemented.

2.

Objectives Accomplished oy:

a.

Review of Section 12.0 of the ASME accepted QA manual, b.

Review of calibration master file.

c.

Review of identifying codes and tool recall system.

d.

Visual observation of calibrated tools and gages in all major work stations.

e.

Interviews with cognizant technical and management personnel.

3.

Inspection Findings The objectives of the inspection were met with no deviation from conunitments identified.

E.

Training 1.

Inspection Objectives The objectives of this inspection were:

a.

To ascertain that programs are established for indoctrination and training of personnel perfonning activities affecting

quality, b.

To ascertain that indoctrination and training measures are effectively implemented.

2.

Method of Accomt'ishment The preceding objectives were accomplished by:

a.

Review of Section 1.3 of the ASME accepted QA manual.

b.

Review of annual training schedules.

c.

Review of training outlines submitted by engineering, produc-tion, quality assurance, and procurement.

d.

Review of training records for_all departments.

)

6 3.

Inspection Findings There were no deviations or unresolved items identified.

F.

Quality Assurance Records 1.

Inspection Objectives The objectives of the inspection were to verify that quality assurance records were maintained for fabrication, manufacturing, or installation and provide traceability, and the records contained as a minimum of documents pertaining to materials manufacturing, exam-ination and test data, procedures, drawings and Stress Report, qualification of personnel, procedures and equipment, and these records are maintained in a manner that allows ready access.

2.

Method of Accomolishment The preceding objectives were accomplished by:

a.

Review of Section 19.0 of the ASME accepted QA manual.

b.

Review of selective QC plans and checklists.

c.

Review of completed data packages for required records.

d.

Interviews with technical and management personnel.

3.

Insoection Findings There were no deviations or unresolved items identified.

G.

Exit Interview The inspector met with those individuals noted in paragraph A above at the conclusion of the inspection on May 8,1980.

The inspector summarized tMe scope and findings identified during the inspection. Management acknowledged the inspector's comments regarding the scope and findings as presented.