ML19320D564

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/80-03 on 800423.No Noncompliance Noted
ML19320D564
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/12/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19320D565 List:
References
NUDOCS 8007210533
Download: ML19320D564 (2)


See also: IR 05000423/1980003

Text

<

T

74

j#

%

UNITED STATES

4

  • 4

NUCLEAR REGULATORY COMMisslON

'

f

,h

REGION I

e

f

$31 PARK AVENUE

KING OF PRUS$1 A. PENNSYLV ANI A 19406

3312 UB0

Docket No. 50-423

.

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering Operations

P. O. Box 270

Hartford, Connecticut 06101

0

.u enen:

Subject:

Inspection 80-03

This refers to the inspection conducted by Mr. A. C. Cerne of this office

on April 23, 1980 at Millstone Nuclear Power Station, Unit 3, Waterford,

Connecticut of activities authorized by NRC License No. CPPR-ll3 and to the

discussions of our findings held by Mr. Cerne with Mr. S. Toth of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

~ disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the infonnation, which identifies the document or

part sought to be withheld, and which contains a statement of reasons which

addresses with specificity the items which will be considered by the Commission

as listed in subparagraph (b) (4) of Section 2.790.

The infonnation sought

to be wi'thheld shall be incorporated as far as possible into a separat

part of the affidavit.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

8 0.0 7 210Y31

_

, _ __ ._

%

-

<

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

L

24-

Robert T. Carlson, Chief

"

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcenent- Inspection

Report Number 80-03

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka,. Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

D. G. Diedrick, Manager of Quality Assurance

,

l

l

t

!

!

- . - - -