T
74
j#
%
UNITED STATES
4
- 4
NUCLEAR REGULATORY COMMisslON
'
f
,h
REGION I
e
f
$31 PARK AVENUE
KING OF PRUS$1 A. PENNSYLV ANI A 19406
3312 UB0
Docket No. 50-423
.
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering Operations
P. O. Box 270
Hartford, Connecticut 06101
0
.u enen:
Subject:
Inspection 80-03
This refers to the inspection conducted by Mr. A. C. Cerne of this office
on April 23, 1980 at Millstone Nuclear Power Station, Unit 3, Waterford,
Connecticut of activities authorized by NRC License No. CPPR-ll3 and to the
discussions of our findings held by Mr. Cerne with Mr. S. Toth of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractor) believe
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
~ disclosure. Any such application must be accompanied by an affidavit
executed by the owner of the infonnation, which identifies the document or
part sought to be withheld, and which contains a statement of reasons which
addresses with specificity the items which will be considered by the Commission
as listed in subparagraph (b) (4) of Section 2.790.
The infonnation sought
to be wi'thheld shall be incorporated as far as possible into a separat
part of the affidavit.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
8 0.0 7 210Y31
_
, _ __ ._
%
-
<
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
.
L
24-
Robert T. Carlson, Chief
"
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcenent- Inspection
Report Number 80-03
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka,. Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
D. G. Diedrick, Manager of Quality Assurance
,
l
l
t
!
!
- . - - -