50 347 e asa.
UNITED STATES M(/
o,,
NUCLEAR REGULATORY COMMISSION e
o E
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 OER$ R P9E July 15, 1980 The Honorable Victor Gilinsky Commissioner U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Dr. Gilinsky:
This is in response to your request of July 10, 1980 concerning particular aspects of the Sequoyah Nuclear' Plant.
First, as mentioned in the Committee's Sequoyah letter of December 11, 1979, the capability of the ice condenser containment design to cope with the steam resulting from a large LOCA was the subject of detailed discussion over a period of years involving the NRC Staff, the vendor, and the ACRS.
As a result of this effort it was concluded that this type of design was fully capable of fulfilling the function mentioned.
We have no reason to change that conclusion.
Second, the latter of the control of large amounts of hydrogen is discussed to some extene in the Committee's Sequoyah letter of this date.
Although the information available at present is preliminary and will require further detailed confirmation both by the Staff and the Applicant, we expect the present general conclusions to be confinned.
The Applicant has committed to proceed quickly with the installation of a distributed ignition system.
The Committee does not believe that there is any practical need to hold up the issuance of an operating license pending completion of the proposed ignition system.
Si ncerely, Milton S. Plesset Chairman 80072.10 8/.