Immediate Action Ltr 80-20 Outlining Actions to Be Taken Per Gf Smith & J White 800703 Telcons W/Wg Counsil,Re Emergency Preparedness Capabilities Identified in 800623-0703 Appraisal.Nrc Must Be Notified in 24-h If Not Agreeable
ML19320D507
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/03/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
IAL-80-20, NUDOCS 8007210445
Download: ML19320D507 (2)


Text

N I

d N 4 UNITED STATES c

t NUCLEAR REGULATORY COMMisslON pw U '. :1 ) S(.

4 E

nEcion i I

$31 PARK AVENUE n:No oF PRUS$1 A, PENNSYLVANI A 19406 Docket No. 50-213 m 03 W File No. IAL 80-20 Connecticut Yankee Atomic Power Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

This refers to the telephone conversation between you and Mr. G. H. Smith of this office on July 3,1980, regarding certain matters affecting the emergency preparedness capabilities at the Haddam Neck Plant identified during the Health Physics Appraisal conaucted during the period June 23 - July 3, 1980.

These concerns were discussed between you and Mr. J. White of the Health Physics Appraisal Team on July 3, 1980.

With regard to the matters brought to your attention by Mr. White and discussed in the referenced conversation, it is our understanding that the following actions will be undertaken and completed as outlined below i

A.

By the end of the current outage and prior to the resumption of operation of the Haddam Neck Plant:

1.

Undertake and complete a review of all emergency plan procedure, i

related to off-site dose assessment and projection (i.e. Emergency Plan 1.5-16, 17) making appropriate revisions to:

a.

Clarify required actions, eliminate existing amoiguities, errata, and omissions.

b.

Clarify the duties and responsibilities of personnel when dif-ferent groups and/or locations are addressed in the present plan, c.

Develop efficient procedures for q 'rability and reliability testing of all emergency survey instruments.

2.

Develop procedures for an emergency repair / corrective action tecm.

3.

Develop criteria for classifying the various types of emergencies listed in your emergency plan. Such criteria are to be based on readings obtained from installed instrumentation as well as the results of environmental surveillance ;rojections.

1 8007210 W5

3 Connecticut Yankee Atomic Power 2

Company JUL 031984 B.

Within five days following the resumption of operation of the Haddam Neck Plant conduct initial traini.ng and retraining of all individuals assigned to the emergency response organization and ensure that those individuals are able to perform their assigned duties in accordance with the entire

~

emergency plan implementing procedure as revised according to item A above.

If our understandings as described above are not in agreement with your actual plans and actions being implemented.. notify this office by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />...

Sincerely, smo.Hb 471/w yce H. Grier rector cc:

R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assurance J. R._ Himmelwright, Licensing Safeguards Engineer J

[