ML19320D228

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800612 Interim Deficiency Rept Re Nonseismic Equipment Installed Over Seismic
ML19320D228
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/01/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19320D229 List:
References
NUDOCS 8007210128
Download: ML19320D228 (1)


Text

..

1)..

.[

Io,j

/

UNITED STATES NUCLEAR REGULATORY COMMISSION

' *~~ ~

s.,

g

.. a REGION ll1 8

799 ROOSEVELT ROAD P,

E GLEN ELLYN,ILLINOls 6o137 o

QUC 1

Docket No. 50-341 Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated June 12, 1980, pursuant to 10 CFR 50.55(e) regarding non-seismic equipment installed over seismic. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, s

/

6 G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/1tr dtd 6/12/80:

Central Files Reproduction Unit NRC 20b PDR NSIC 8007210/2P S

--e.