ML19320D109
| ML19320D109 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 07/07/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| IEB-80-17, NUDOCS 8007180575 | |
| Download: ML19320D109 (1) | |
Text
pre f[
UNITED STATES
]
3' NUCLEAR REGULATORY COMMISSION n
N
- E REGION ill
'[
799 ROOSEVELT ROAD Q
j' GLEN ELLYN. ILLINOIS 60137 JUL 7 1980 Docket No. 50-155 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
This is to inform you that the time clock on Item 2 of IE Bulletin No. 80-17
" Failure of Control Rods to Insert During a Scram at a BWR" will start at 12:01 a.m. on July 8, 1980. As stated in the Bulletin the test should be completed within 20 days.
If the test would cause a severe impact on power reliability, promptly notify the Licensing Project Managers of the Office of Nuclear Reactor Regulation for your facility by telephone.
An additional parameter is being considered for measurement to determine the pressure variation with time in each of the headers of the Scram Discharge Volumes (SDV) during the test scrams. The NRC requests immediate notifica-tion of any malfunction identified during the surveillance tests or special tests conducted in accordance with the IE Bulletin No. 80-17.
Sincerely,
-:a.9h
~
/ James G. Kepp e Director cc:
Mr. D. P. Hoffman, Nuclear Licensing Administrator Mr. C. J. Hartman, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission 8007180619