Ack Receipt of 800513 Final Deficiency Rept Re Failure to Meet PSAR Basis Secondary Cooling Flow Rate Due to Main Feedwater Line Rupture W/Concurrent Failure of Steam Generator Blowdown Isolation Valve on Another Loop
ML19320D092
Person / Time
Site: Marble Hill
Issue date: 07/07/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8007180536
Download: ML19320D092 (1)


Text

/ gueroyjd UNITED STATES g- -

NUCLEAR REGULATORY COMMISSION 8

o E

REGION lli

-e #

799 ROOSEVELT ROAD e

GLEN ELLYN, ILLINOIS 60137 d

JIJL 7 G801 Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Senior Vice President Nuclear Division 1000 East Main Street Plainfield, IN 46168 Gentlemen:

Thank you for your final report dated May 13, 1980, pursuant to 10 CFR 50.55(e) regarding the meeting of the PSAR basis secondary cooling flow rate due to main feedwater line rupture, with a con-current failure of the steam generator blowdown isolation valve in another loop. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, 4

G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

C. Kammerer, CA H. Thornburg, IE Mr. G. N. Brown, Project Director Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of Attorney General Mr. John R. Calloway, Staff Di;ector, Environment, Energy and Natural Resources Subcommittee 8007180 M S