VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-06 FOR THE MONTH OF JUNE, 1980 i
l-80 0718070d i
OPERATING D ATA REPORT 50-271 DOCKET NO.
DATE 800708 CO.i!PLETED IJY F.C. Beers TELEPHONE 617-366-9011 X2215 OPERATING ST ATUS Vermont Yankee Notes
- 1. Unit Name:
June 1980
- 2. Reporting Period:
- 3. Licensed The:msl Power (StWri:
1593
- 4. Namepiste Ratin; tGross 3thet:
540
- 5. Design Electrient Rating (Net 3twel: 514 ( P8") 504 (closed)
- 6. >!nimum Cependable Capseity iGross StWel:
- 7. Sluimum Dependsbie Capacity (Net 31Wel:
504 S. If Changes Occur in Capscity Ratin;s t. items Number 3 Through 71 Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net StWe):
,10. Reasons For Restrictions. !f Any:
C This Stonth Yr to-Date Cumulatise
-11. Hours in Reporting Pe-iod 4.367.00
- 12. Number Of Kours Reactor Was Critics!
672.28 4,173.71 55.332.10
- 13. Reactor Reserve Shutdown Hunts 0.0 0.0 0.0 660.00 4,118.60 53,446.38
- 14. Hours Generator On-Line
- 15. Unit Re>ene Shutdown Hour, 0.0 0.0 0.0
- 16. Cross Thermsi Energy Gener:ted (.\\lWH) 969,742.00 6,309,169.00 75,533,802.00
- 7. Gross Electrics 1 Energy Gexented talhHi 318,668.00.
2,141,802.00 25.111,472.00
- 18. Net Electrical Energy Genersted (51WH) 298,640.00
'"2,043,101.00 23,811,466.00 91.67 94.31 78.41
- 19. Unit Service Factor
^- i
- 20. Unit Availability Factor 94.31 78.41
- 21. Unit Capscitv Factor tU>in; 31DC Neti 82.30 92.83 69.31 80.70 91.02 67.96
- 22. Unit Capseity Factor (Using DCR Neti 6.JJ
- 23. Unit Forced Outs;c Rate 2.07 6.19 l
- 24. Shutdown > Scheduled Ou:r Next 6.'.lunths iType. Date.and Duration of Eschi:
j 1.
CRD Testing as required by the NRC scheduled for Mid July. Duration unknown 2.
Annual refueline scheduled for eight weeks beeinnine Sentamher 26. 1980
-23. If Shur Down At End Of Report Period. Estimsted Dste of Startup.
- 26. Units in Test Status t Pr or to Commercial Operationi:
Forecast uhiesed l
l INITIA L CRITICALITY l
INITI A L ELECTRICI rY CO3talERCI.\\L Ol'ER.\\ TION goi-i
.=
DOCKET NO. 50-171 UNIT Vermont Yankee DATE 800708 COMPLETED BY F.J. Burger TELEPHONE 802-257,7711 X137 REPORT MONTH June, 1980
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 84.35% of rated thermal power for the month.
Gross electrical generation was 318,668 MWH or 81.95% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
6/1/80 At the beginning of the reporting period the plant was at 99.1%
of rated thermal power.
6/11/80 At 1200 hrs. a power reduction was initiated to investigate leakage into the costeinment. This was followed by a shutdown l
to repair a leak in a feedwater check valve. The turbine i
was tripped at 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br />.
6/13/80 At 1110 hrs. a start-up was initiated. The turbine was phased l
onto the grid at 2043 hrs.
6/15/80 At 0927 hrs. "B" Recirculation Pump tripped causing a power reduction. The pump was restarted and a power ascension initiated.
6/17/80 At 1401 hrs. the reactor scrammed due to a turbine trip caused by a high water level in a moisture seperator drain tank. The problem was resolved (see attached Shutdown & Power Reductions Sheet) and a plant startup initiated. The turbine was phased onto the grid at 2231 hrs.
6/30/80 At the end of the reporting period the plant was a 99.5% of rated thermal power.
I i
i
AVERAGE DAILY L' NIT POh ER LEVEL
~
DOCKETSO.
Vermont Yankee IJNIT 00708 DATc i
F.J. Biarger COMPLETED BY TELEPHONE 802-257-7711 X137 June 1980 MONTH DAY AVERAGE I
VER LEVEL day AVERAGE DAILY POWER LEVEL i
(MWe Net l 1
491 251 l.
o 492 323 i
18
~
~
377 37 489 i9 491 457 4
,0 495 493 5
i 6
492 492
..(
493 7
23 489 493 S
24 484 497 480 9
33 498 IO 26 468 11 289 457 27 0
494 12 13 24 492
,9 311 14 30 490 303
,I 31 l
339 16 INSTRUCTIONS On this fortnst. list the act::ge daily unit power lese! in Mwe. Net n r aach day in the reporting n;. nth. C unpuie to the nesrest wiiole ene;: watt.
(u /7? )
8 50-271 I
KE UNIT SilOTDOWNS AND POWER REDUCTIONS l
Vermont Yankee gg DAU-JQDZD3 3
COMI'l.i.llill llY F. J. Burge__r RI:POllT MONill June i g,g,tg.gio,Ng; 1-802-257-7711 X 137 S
E E-
't 3 E' 5 gitensec E-E*!,,
t anw.t l'osses sive N., ~
1).sve 8-Nh k
)5h livent h,5 3
A"""
p Bd y
r,.E c gep.ui a mO E'
l*scuni Res nuena.
c-pmy o
[
80-14 80-06-11 F
51.5 A
1 N/A Cll VALVEX Leakage from feedwater check valve caused by failed valve seal. Replaced seal.
80-15 80-06-15 F
0 A
4 N/A CD RELAYX Recirculation pump tripped while (power resetting pump HG set relays. Restarted reduc-
- pump, tion) 80-16 80-06-17 F
8.5 A
3 N/A IIA VAI. VEX liigh level in main turbine moisture separator drain tank tripped the turbine and scrammed the reactor, liigh level caused by faulty drain valve. The valve was repaired.
I I
e limluliit C - In588n'li"n' Meignid:
I.
l..... cd Reau en,
S ' S.ltedisl.*al A 18lillpiliClll I Ji!ilIC I!'Mp!JIII) g,g,,,,y g,,, p, e p,,,, j,,n,,g 9 3,,,
,g y y.g.c
- f. g'[g,',)i,,g
- 3. Aus.inutic L eam.
livesil 1:cpos e 11.1 It l l7de INilHI G-D.n,.,aa....,
ne.. icii.i.,
m.e own!
o" o 1 Opceasos liaining A l.isenw 17xaminatinn 11 Adnunistiasi.e g z' g,,,,,,,, 3,,,,,.,,,,,,,..
i G Og esationi.il I isos ll xpliini g.s,in g ll Othes tlapl.nni
DOCKET NO.
50-271 l
UNIT Vermont Yankee DATE 800708 COMPLETED BY F.J. Burger TELEPHONE 802-257-7711 X137 MONTilLY EQUIPMENT MAINTENANCE June 1980 Page 1 of 1 NATURE OF LER OR OUTAGF EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Main Steam Valve Corrective MR80-397 N/A Worn Packing Leakage Replaced bonnet gasket and MS 938, EPR Sensing packing.
Lina Isolation RWCU Valve V-12-19A Corrective MR80-409 N/A Worn Parts Leatrage Replaced seal ring & packingL RilR Valve V10-46A Corrective HR80-488 N/A Worn Parts Leakage Replaced gasket & packing Feed Water Check Valve V2-28B Corrective MR80-613 Outage 80-14 Worn Parts Leakage Replaced seal ring Drywell Air Lock Corrective MR80-619 N/A Component Inner Door Gasket Deterioration Degraded Casket Replaced gasket RPS Relay SA-K12A Corrective HR80-493 N/A Component Deterioration Burned Relay Replaced relay coil l
Steam Tunnel Temp.
Corrective MR80-584 N/A Component Switch TS-2-121D Halfunction Set Point Drift Repicced switch Containment Sampling Corre,ctive HR80-634 LER 80-20/3L Dirt Valve Sticking
' Disassembled and cleaned
~;
System Isolation Valve valve.
109-76A 4