ML19320C647
| ML19320C647 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/01/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19260E464 | List: |
| References | |
| NUDOCS 8007170498 | |
| Download: ML19320C647 (1) | |
Text
-
y- -
CENTRAL FILES.
pyl 1M Docket No. 50-341 Detroit Edison Company ATTN: Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Thank you for your final report dated June 13, 1980, pursuant to 10 CFR 50.55(e) regarding defective Westinghouse Switches. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/ltr dtd 6/13/80:
Central Files Reproduction Unti NRC 20b PDR NSIC RIII RII<I3 RIII$
Barrett/jp Knop Fiore li 6/30/80 8007170
gy-Detroit June 13, 1980 reco secena 4.,,,,
Edison rannx ->>-
EF2-49,015 Mr. James C Keppler Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
10CFR50.55(e) Item on Defective Westinghouse Switches.
Dear Mr. Keppler:
This letter is submitted as Detroit Edison's final report on the 10CFR50.
55(e) item on defective Westinghouse Switches.
On December 7, 1979, Detroit Edison's Mr. H.A. Walker telephoned Mr. F.J.
Jablonski of NRC Region III to report on defective Westinghouse Switches in distribution cabinets used to distribute power for plant instrumentation and control at the Fermi 2 Site. These switches were manufactured by West-inghouse Electric Corporation and furnished to Detroit Edison by the Harlo Corporation.
Edison Engineering has completed their evaluation of this deficiency. The attached report includes a description of the deficiency, and the corree-tive action taken. Corrective action will be completed in accordance with the construction schedule.
If you have any questions regarding this matter, please contact Mr. H.A.
Walker, Supervisor - Construction Quality Assurance.
Sincerely,
- c.9 W W.J. Fahrner, Manager Enrico Fermi 2 WJF/ HAW /pn cc