LER 80-096/03L-0:on 800627,w/reactor Mode Switch in Run, Reactor Bldg to Torus Vacuum Breaker Isolation Valve, 2T48-F311,failed Open.Caused by Failure of Delta Pressure switch,2T48-N211,reactor Bldg to Delta Pressure Switch
ML19320C624
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/09/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19320C614 List:
References
LER-80-096-03L, LER-80-96-3L, NUDOCS 8007170468
Download: ML19320C624 (2)


Text

'"'

. LICALSGE EVENT REPORT

/ CONTR!L DLOCK: l l l l l l (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATIONI

> l11 l GlLICENSEE Al E CODE l I l Hl 142 lh! 0 l 0 l -l 0LICENSE lb l 0 l NUMUEH 0 l 0 l 0 l - l 0 l2b0 lh! 20 4 LICENSE l 1 l 1TYPE l 1 Jol 1 lh! l

$7 CAI bd l@

$ 9 ton *T Dltl 8

3$n"C60 l Ll@l 61 0l 5DOCKET l 0 lNUMBEH 010 l 3 l 6 La l 6 03 @lEVENT0l6 DATEl 2 l 7 l 8 l 0 @l 14 7b 0 DATE REPORT l 7 l 0 lU09 l 8 l o l@

EVENT DESCRIPTION AND PRODABLE CONSEQUENCES h With the reactor inode switch in run, reactor buildino to torun vacuum break- l D l2l l l

er isolation valve, 2T48-F311, failed open. There was no effect on safe [

D l 31 l 1

ol4ll plant operation, because redundant valve 2T48-F310 was still operable. The [

o!sl l health and safety of the public was not affected. This is a repetitive [

< l6 l l event and was last reported on Reportable Occurrence Report No. 50-366/ l 1980-054.

l

l7 l l I

91811 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SU8 CODE COMPONENT CODE SU8 CODE SUBCODE al9l 8

lI lE lh Wh l E lh f Il Bl Sl Tl Rl Ul@ l Sl@ ]@

9 10 11 12 13 18 19 20 REVISION SEQUENTIAL OCCURRENCE REPORT

,_ EVENT YE AR REPORT NO. CODE TYPE N O.

@ g"LER/RO U

E l8 l0 l g l0 l9 l6 l lpl l 0l 3l l Ll g l0 l 32 22 23 24 26 27 28 29 30 31

_ 21 ON PL NT ET HOURS S BNIT 50 A d B. SUPPLIE MAN FACTURER AKEN AT W @lAl@

33 34 lZl@

35

[ Z_jh 36 l0l0l0l0l 31 40

]Q 41 l42Nl@ l43A l@ l44S l 3 l 8 l 247 l@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS igoll The reason the reactor building to torus vacuum breaker isolation valve, l

,i li l l 2T48-F311, failed open was due to the failure of delta pressure switch l j,,7, 2T48-N211, reactor building to torta delta pressure switch. A new micro  ;

l A new switch assembly has been

,,3j l switch was installed and calibrated. l 3l4i j cfrdered to replace existing switch. l 80 f 8 9 ST S '4 POWER OTHER STATUS DSO FY DISCOVERY DESCRIPTION i ls_j l Elh l 0 l 9 l 8 l@l NA l l A l@l Operator observation. l A TlVITY CO TENT RREASED OF REM ASE LOCATION OF RELEASE @

i I6 8i 9LzJ @ LzJ@l AMOUNT n^ OF ACTIVITY 44 l

4h

@ lu^ l 80 .

7 to it PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION y l0l0l0l@lZl@l " NA l

PEnSON~E L iN;u',?iES NUMntn DESCRiPTiO~@

NA l F

TTiil8 9l 0l 0l 0l@l 11 11 30 LOSS OF OR DAMAGE TO FACILITY TYPE DESCf11P1104

"^

E Lzl@l "

l l%%ur PUBLt TY DE SCf11PTION MMO QQ Nnc Usc oNtY ,

2 a L"I I N^ l 11111111111111 o8 69 80 S 7 8 9 to NAME OF PREPARER PHONE:

=

NARRATIVE REPORT Georgia Power Company Plant E. I. Hatch ,

,Baxley, Georgia 31513 Reportable Occurrence Report No.' 50-366/1980-096.

With the reactor mode switch in the run position, reactor building to torus vacuum breaker isolation valve, 2T48-F311, failed open. There was no effect on safe operation. Redundant valve 2T48-F310 was still operable. The health and safety of the general public was not affected. This is a repetitive event and was last reported on Reportable Occurrence Report No. 50-366/1980-054.

The reason the reactor building to torus vacuum breaker isolation valve, 2T48-F311, failed open was due to the failure of differential pressure switch 2T48-N211, reactor building to torus delta pressure switch. A new micro switch was installed and calibrated and valve 2T48-F311 was returned to operable status. A complete new switch assembly has been ordered and will be installed when it arrives on-site. A follow-up report will be submitted. Unit I does not use these type switches.

No inherent problems were discovered during the generic review.