IE Insp Repts 50-440/80-08 & 50-441/80-08 on 800506-09. Noncompliance Noted:Failure to Specify Appropriate Codes or Stds in Purchase Order
ML19320C385
Person / Time
Site: Perry  
Issue date: 06/02/1980
From: Danielson D, Eric Lee
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19320C376 List:
References
50-440-80-08, 50-440-80-8, 50-441-80-08, 50-441-80-8, NUDOCS 8007160741
Download: ML19320C385 (6)


See also: IR 05000440/1980008

Text

i

0

.

.

U.S. NUCLEAR REGULATORY COMMISSION

g

0FFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report Nos. 50-440/80-08; 50-441/80-08

Docket Nos. 50-440; 50-441

License No. CPPR-148; CPPR-149

Licensee: Cleveland Electric Illuminating Co.

P. O. Box 5000

Cleveland, OH 44101

Facility Name:

Perry Nuclear Power Plant, Units 1 and 2

Inspection At:

Perry Site, Perry, Ohio

Inspection Conducted: May 6-9, 1980

2. [o

Inspector:

E. W. K. Lee

ea-~JL

'

Approved By:

D. H. Danielson, Chief

d

O

Engineering Support Section 2

/

'

Inspection Summary

Inspection on May 6-9, 1980 (Rerort Nos. 50-440/80-08; 50-441/80-08)

Area Inspected:

Reactor Coolant Pressure Boundary Piping work activities

and welding procedures; safety-related piping work activities and welding

procedures and quality records. The inspection involved a total of 23 on

site hours by one NRC inspector.

Results: Of the six areas inspected no apparent items of noncompliance or

deviations were identified in 5 areas; one apparent item of noncompliance

was identified in one area (infraction - failure to specify appropriate

codes or standards in purchase order, Paragraph 4a(2)(e).

8007180

-

..

'

DETAILS

Persons Contacted

Principal Licensee Employees

  • B. L. Barkley, General Supervising Engineer
  • M. Edelman,' Manager, Quality Assurance Department
  • A. Kaplan, General Supervisor Construction
  • P. Martin, General Supervising Engineer

- *E. M. Root, Supervisor, Construction Quality Support Services

  • R. L. Vondrasek, Quality Engineering Supervisor

Other Personnel

  • T. J. Arney, Quality Assurance Program Manager, Gilbert Associates, Inc.
  • P. L. Gibson, Construction Quality Control Supervisor, Kaiser Engineers Inc.
  • Depotea those who attended the exit interview.

The inspector also contacted other licensee and contractors employees,

including members of the quality, technical, and engineering staffs.

Functional or Program Areas Inspected

.

1.

Reactor Coolant Pressure Boundary Piping - Review of Quality Assurance

Procedures (Units 1 and 2 )

The inspector reviewed the General Electric Company Installation and

Service Engineering Division (I&SE) Corporate Region Nuclear Quality

Assurance Manual dated June 27, 1978, including Perry Site addendum

dated December 2, 1979, and thirteen I&SE procedures relative to the

Reactor Coolant Pressure Boundary Piping work activities. These

procedures included site procurement documents requirements and con-

trol; receiving inspection; material control;

identification; clean-

liness control; erection and installation. The inspector determined

that the procedures meet the PSAR commitments, Quality Assurance

Manual, 10 CFR 50, Appendix B, and the applicable code requirements.

No items of noncompliance or deviations were identified.

2.

Reactor Coolant Pressure Boundary Piping - Welding Procedures Specifica-

tions and Quality Assurance Procedures (Units 1 and 2)

The inspector reviewed the I&SE Corporate Region Nuclear Quality

Assurance Manual dated June 27, 1978 including Perry Site addendum

uated December 12, 1979, and sixteen I&SE procedures relative to the

welding of Reactor Coolant Pressure Piping. These procedures includ-

ed weld data sheets, including hold points; qualification of welding

-2-

,

.

'

procedures, welders and inspection personnel; control of preheat and

interpass temperature and control of welding materials. The inspector

determined that the procedures met the PSAR commitments, Quality

Assurance Manual, Appendix B, and the applicable code requirements

except the following procedures require clarification, generation

and/or consideration of improvements.

a.

Conflicting weld bead width criteria in procedures Nos. GEP-

IP-0005 and GWP-1000.

b.

Clarification of how return welding materials are handled.

c.

Consideration of documenting welding parameters when monitored

by QC personnel.

'

d.

Issuance of weld repair, calibration, and other procedures as

required by Perry Site addendum to I&SE QA Manual.

This item is considered unresolved pending a review during a subsequent

inspection (50-440/80-08-01; 50-441/80-08-01).

No items of noncompliance or deviations were identified.

3.

Safety Related Piping - Observation of Work and Work Activities

(Units 1 and 2)

The inspector observed the following safety related piping work

activities:

a.

Rigging and protection of Unit 1 Residual Heat Removal System

Spool No. 1E12-G-RH-168-AB.

b.

Fit-up and alignment of Unit 2 Emergency Closed Cooling System

weld No. 09 on isometric drawing No. 2-P42-41.

c.

Fit-up and alignment of Unit 1 Residual Heat Removal System weld

No. 09 on isometric drawing No. 1-E12-40.

The inspector determined that work activities were performed in ac-

cordance with the applicable procedures and good construction prac-

tices were adhered to.

The inspector also observed a lamination like

defect adjacent to weld No. 09 on isometric drawing No. 1-E12-40.

The defect was investigated and removed by grinding. The inspector

observed the liquid penetrant examination after grinding and verified

the defect has been completely removed. However, subsequent ultrasonic

examination indicated the minimum wall thickness has been violated.

Nonconformance Report was initiated and weld No. 09 was cut and 12"

of the the base metal was replaced.

No items of noncompliance or deviations were identified.

.

-3-

.

4.

Safety Related Piping - Welding Material Control (Units 1 and 2)

,

a.

Review of Documents

The inspector reviewed the following documents:

(1) The inspector established that Pullman Power Products pro-

cedures for weld material control have not been revised

since the last review (IE Inspection Report No. 50-440/79-12

and No. 50-441/79-12, paragraph 4).

(2) Receiving Inspection Report, Material Certification and

Purchase Order for E7018 electrodes with heat No. 411W3241

and lot No. 026B23; heat No. 422T0431 and lot No. 026B10;

heat No. 02M558 and lot No. 026B26; heat No. 412W3931 and

lot No. 026B22; E70S-2 K Insert with lot No. 3702B131 and

E70S-6 wire with heat No. 655T388.

It was determined that:

(a) The material test report for the E7018 electrodes with heat

No. 411W3241 and lot No. 026B23 indicated one (1) as welded

specimen has a lateral expansion of 23 mils, two (2) stress

relieved specimens, one has a lateral expansion of of 14

mils and the other 30 mils.

147 lbs. of this material was

received at the Perry site on August 9, 1977. The inspector

was informed that 21 lbs. of this material is unused and

six (6) 48" diameter x 3/8" thick wall, ASME Section III,

Class 3 pipe weld in the Plant Foundation Underdrain System

were welded with this material.

(b) The material test report for the E7018 electrodes with heat

No. 422T0431 and lot No. 026B10 indicated that one (1) as

welded specimen has a lateral expansion of 22 mils.

100 lbs.

of this material was received at the Perry site on August 9,

1977. The licensee stated that the majority of this material

was used in the non-safety related system and the rest of

this material was used in the test booth.

(c) The material test report for the E7018 electrodes with heat

No. 02M558 and lot No. 026B26 indicated one (1) stress re-

lieved specimen has a lateral expansion of 20 mils.

100

lbs. of this material was received at the Perry site on

August 9, 1977. The inspector was informed that all this

material is unused and will be used in test shop only if

used in the future.

(d) The material test report for the E70S-6 wire with heat

No. 655T388 indicated two (2) as welded specimen, one has

a lateral expansion of 11 mils and the other 27 mils. The

-4-

.

b

e=

-

9,

e-

g *

+4

- -M - * 49

  • + ' ". *

-W

w

._

.

,

'

lateral expansion of the three (3) stress relieved speci-

mens are 31, 28, and 28 mils.

10 lbs. of this material was

received at the Perry site on August 9,1977. The inspector

was informed this material was used on four (4) 48" diameter

3/8" thick wall, ASME Section III, Class 3 pipe welds in

the Plant Foundation Underdrain System.

(e) Purchase Order No. 19-04-00-76-15 does not specify the

appropriate codes or standards but stated that wire chemis-

try was to conform to G.E. Specification No. B50A533.

However, the material tett report indicated the material

failed to meet the GE specification chemical requirements;

nonetheless, ASME Section II chemical requirements were met.

This condition represents an item of noncompliance as identi-

fied in Appendix A (50-440/80-008-02; 50-441/80-0802).

b.

Control of Materials

The inspector toured PPP welding material issuing station loc-

ated at the intermediate building elevation 599'0".

It was

determined that (1) the welding materials are properly ident-

ified and segregated; (2) the temperature of the rod ovens is

maintained; (3) records are properly kept; and (4) issuance and

return of welding materials are controlled in accordance with

approved pracedures.

Except as noted, no items of noncompliance or deviations were

identified.

5.

Safety Related Piping Observation of Welding Activities Unit 1

The inspector observed welding of Liquid Radwaste System weld No. 02

on isometric drawing No. 0-G50-50 and Residual Heat Removal System

weld No. 09 on isometric drawing No. 1-E12-40.

It was determined that

(1) work was conducted in accordance with traveler; (2) proper

welding materials were used; (3) welding procedure requirements were

met; (4) work area was free of weld rod-stubs; and (5) physical

appearance was acceptable.

No items of noncompliance or deviations were identified.

6.

Safety Related Piping - Weld Heat Treatment (Unit 1 )

a.

Review of Preheating Procedure

The inspector reviewed PPP procedure No. IX-3 dated April 19,

1974, and determined that preheating and monitoring methods are

i

specified and acceptable.

-5-

/

I

,

~

__

.

b.

Observation of Preheating

'

While observing welding activities for items stated in Paragraph

5 of this report, the inspector determined that preheat met the

procedure requirements.

No items of noncompliance or deviations were identified.

7.

Safety Related Piping - Welder Qualification (Unit 1)

The inspector reviewed the following documents:

a.

PPP procedure No. II-8 dated May 12, 1978, " Welder Performance

Qualification".

b.

Qualification records of welders performing welding on welds

stated in paragraph 5 of this report.

The inspector determined that the above documents met the requirements

of ASME B & PV Code,Section IX.

No items of noncompliance or deviations were identified.

8.

Safety Related Piping - Special Welding Application (Unit 1)

The inspector observed the grinding of defect of the Re, idual Heat

Removal System weld No. 10 on isometric drawing No. 1-1 .2-1.

It was

determined that (1) work was conducted in accordance with traveler;

(2) procedure requirements were met; (3) radiographic film after the

repair was completed indicated a new defect in the weld; and (4) this

weld was subsequently cut-out.

No items of noncompliance or deviations were identified.

Unresolved Items

Unresolved items are matters about which more information is required in

order to ascertain whether they are acceptable items, items of noncom-

pliance, or deviations. Unresolved items disclosed during the inspection

are discussed in paragraph 2.

Exit Interview

The inspector met with licensee representatives (denoted under Persons

Contacted) at the conclusion of the inspection on May 6-9, 1980. The

inspector summarized the purpose and findings of the inspection. The

licensee acknowledged the findings reported herein.

-6-

.

, . - -

.

,