ML19320C221

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/80-17 & 50-547/80-17 on 800422-25,30 & 0513.No Noncompliance Noted
ML19320C221
Person / Time
Site: Marble Hill
Issue date: 06/10/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML19320C222 List:
References
NUDOCS 8007160469
Download: ML19320C221 (2)


See also: IR 05000546/1980017

Text

-

'o,,

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

'

o

  • f

3

'E

REGION ill

O

799 ROOSEVELT ROAD

,e

GLEN ELLYN, ILLINOIS 60137

,

.....

EdUN 1 0 G80

Docket No. 50-546

Docket No. 50-547

Public Service of Indiana

ATTN:

Mr. S. W. Shields

Senior Vice President

Nuclear Division

Post Office Box 190

New Washington, IN 47162

Gentlemen:

This refers to the inspection conducted by Messrs. E. R. Schweibinz,

J. J. Harrison, C. C. Williams, D. W. Hayes, J. E. Konklin and F. C. Hawkins

of this office on April 22-25 and May 13, 1980, of activities at Marble

Hill Nuclear Generating Station, Units 1 and 2, authorized by NRC Construc-

tion Permits No. CPPR-170 and No. CPPR-171, to the meeting conducted at

our office in Glen Ellyn, Illinois on April 30, 1980 and to the discussion

of our findings with you, Mr. Ramsett and other members of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

'a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so tbat proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

-

8007160 %

,

.

.

r-

.

G80

'

Public Service of Indiana

2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

$c k y

G. Fiorelli, Chief

Ret. tor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-546/80-17

and No. 50-547/80-17

cc w/ enc 1:

C. Kammerer, CA

H. Thornburg, IE

Mr. G. N. Brown, Project

Director

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

LeBoeuf, Lamb, Laiby & MacRae

Mr. Dave Martin, Office of

Attorney General

Mr. John R. Galloway, Staff

Director, Environment, Energy

and Natural Resources Subcommittee

.

.

_

-

-

9

a

e

-w

=