ML19320C040

From kanterella
Jump to navigation Jump to search
Forwards LER 80-095/03L-0
Date released: 12/10/2019 Download: ML19320C040


LER 80-095/03L-0:on 800617,during HNP-2-3123,loop Control Sys Blower Operability,Inboard Leadkage Control Sys Flow Indicator a Pegged Upscale & Would Not Return to Zero.Caused by Bent Flow Element Float.Float Straightened & Cleaned
ML19330A093
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/07/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19330A093 (2)
Forwards LER 80-095/03L-0
ML19320C039
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/07/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19320C039 (1)