ML19320B963

From kanterella
Jump to navigation Jump to search
Forwards LER 80-048/01T-0
Date released: 11/30/2019 Download: ML19320B963


LER 80-048/01T-0:on 800627,during IE Bulletin 79-14 Insp, Pipe Support HCB-40-B1 Found Not Installed & CCA-8-H15 Found Mislocated.Caused by Initial Const/Installation Error. Supports Will Be Installed in Proper Locations
ML19320B966
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/10/1980
From: Mekbel C
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19320B966 (2)
Forwards LER 80-048/01T-0
ML19320B962
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/10/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19320B962 (1)