ML19320B564

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/79-34 on 791218-19.No Noncompliance Noted
ML19320B564
Person / Time
Site: Davis Besse 
Issue date: 06/17/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19320B565 List:
References
NUDOCS 8007140464
Download: ML19320B564 (2)


See also: IR 05000346/1979034

Text

_

_

.-

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

., -. c

f

UNITED STATES

'

5

NUCLEAR REGULATORY COMMISSION

,

a

REGION lil

g

#

'

o

799 ROOSEVELT ROAD

e

GLEN ELLYN,ILLINOls 60137

  • ...*

rJUN 1 7 se0

_

Docket No. 50-346

py[ p y r'"T P Y W ,,c d,- I; e,n %

j

@]

Toledo Edison Company

'

,

Ii. d LNSOrd "'~

'~

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemsn:

This refers to the inspection conducted by Mr. L. R. Greger of this

office on December 18-19, 1979, of activities at Davis-Besse Nuclear

Power Station, Unit 1, authorized by NRC License No. NPF-3 and to

the discussion of our findings with Mr. B. Beyer and others of your

staff at the conclusion of the inspection.

The inspection was an examination of activities conducted under your

license as they relate to radiation safety and to compliance with the

Commission's rules and regulations and with the conditions of your

license. The inspection consisted of a selective examination of pro-

cedures and representative records, observations, independent measure-

ments, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Ru 71ations, a copy of this letter and the

enclosed inspection report will oe placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe te be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

8007140gg9

_

-

.

,

3 ;

Toledo Edison Company

-2-

h

.We will' gladly discuss any questions you have concerning t is

inspection.

_

Sincerely,

.

A.'B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure: IE Inspection

Report No. 50-346/79-34

cc w/ enc 1:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

1

.

Fisher (l0

Da is

Reyes

Greger/gl5

6 .2/80

6 /(a

4Qh(f)

'

'

'

-

.

_

, _ . . . .