Forwards IE Insp Repts 50-498/80-11 & 50-499/80-11 on 800505-08.No Noncompliance Noted
ML19320B412
Person / Time
Site: South Texas  
Issue date: 05/23/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19320B413 List:
References
NUDOCS 8007100342
Download: ML19320B412 (2)


See also: IR 05000498/1980011

Text

__

._- _- -

f5G

UNITED STATES

jP"%9'o

NUCLEAR REGULATORY COMMISSION

[4

g

4EGloN IV

n

l

o

611 RY AN PLAZ A DRIVE, SulTE 1000

<5'

f

ARLINGTON, TEXAS 76012

\\ ,.. /

May 23, 1980

%

In Reply Refer To:

RIV

Docket No. 50-498/Rpt. 80-11

50-499/Rpt. 80-11

Houston Lighting and Power Campany

Attn: Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlemen:

This refers ;.o the inspection conducted by Messrs. L. D. Gilbert and L. E.

Martin of our staff during the period May 5-8, 1980, of activities authorized

by NRC Construction Permits No. CPPR-128 and 129 for South Texas Project,

Units No. 1 and 2, and to the discussion of our findings with Mr. T. J. Jordan

and other members of your staff at the conclusion of 2e inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these sreas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were identified.

One new unresolved item is identified in paragraph 5.a of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8007100 N

q

- -.

.

.

.. ..

Houiston Lighting and Power Company

2

May 23, 1980

.

Should you have any questions concerning this inspection, we will bc pleased

to discuss them with you.

Sincerely,

f

U. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/80-11