ML19320B376
| ML19320B376 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/30/1980 |
| From: | Ottoson H SOUTHERN CALIFORNIA EDISON CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML14107A385 | List: |
| References | |
| NUDOCS 8007100262 | |
| Download: ML19320B376 (2) | |
Text
r r
Southern California Edison Company P O box 800 2 2 4 4 W A L N I; T G R O S E A V E N u t R O S E '.'l A C C A L Ir ORNI A 9?770 June 30, 1980 U. S. thclear Regulatory Ommission Office of Inspection and Enforcement Region V 1990 North California doulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94546 Attention:
Mr. R. H. Engelken, Director i
DJCKET 10. 50-206 g
SAN Ot0FRE UNIT 1 i
Reference:
Letter from SCE (H. L. Ottomn) to U.S. NRC Region V (R. H. Engelken) dated March 31, 1980.
Dear Sir:
In accordance with the provisions of Section 5.6.1 of Appendix B (Environmantal Technical Specifications) to the Provisional Operating License DPR-13, as amended, we are subnitting information relative to our environ-mental surveillance programs for 1979. %is information covers the reporting period frcm January 1,1979 to December 31, 1979.
We referenced letter forwarded Volumes I through IV of San Onofre Annual Report for 1979. Subnitted herewith (original plus two copies) is Volume V, Biological and Oceanographic Data Analyses. %ese reports contain oceano-i graphic and biological data responsive to requirements of the Nuclear Regulatory Ommission - Environmental Technical Specifications (ETS) for Unit 1, Preoperational Monitoring Program (PMP) for Units 2 and 3, and special Ichthycplankton Study; as well as the California Regional Water Quality Control Board, San Diego Region - NPDES Percit Receiving Water and Sediment Monitoring for Units 1, 2 and 3 and Construction Monitoring Program (GP) for Units 2 and 3.
All five volumes are provided since the information contained is conplementary ard reflects the total marine nonitoring program for Units 1, 2 and 3.
W e total information package exceeds the specific requirements of the Unit 1 Environmental Technical Specifications.
80 0 71LP0 2,92
f (lr
O. S. Nuclear Regulatory Comission Docket No. 50-206 Page 2 Should you have any questions, please contact me.
Sincerely, 0
w H. L. Ottoson Manager of Nuclear Operations
Enclosure:
Volume V.
Biological and Oceanographic Analyses Environmental Technical Specificaticns, Unit 1 Construction Monitoring Program, Units 2 and 3 Preoperational Monitoring Program, Units 2 and 3 Special Study:
Ichthyoplankton cc: Director of Nuclear Reactor Regulation (17) 1 b
I t
_