ML19320B221

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/80-22 & 50-366/80-22 on 800412-0512.No Noncompliance Noted
ML19320B221
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/29/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19320B222 List:
References
NUDOCS 8007100064
Download: ML19320B221 (2)


See also: IR 05000321/1980022

Text

_ __

D

,

g or

8{

,

""4 gy

UNITED STATES

^

NUCLEAR REGULATORY COMMISSION

n

,

g

$

E

REGION 11

'

t

o,

101 MARIETTA ST N.W SUITE 3100

ATLANTA, G EORGIA 30303

.....

In Reply Refer To:

MAY 2 91980

N RII:RFRIII

50-321/80-22

50-366/80-22

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. F. Rogers of this office on April 12

through May 12, 1980 of activities authorized by NRC License Nos. DPR-57 and

NPF-5 for the Hatch facilities, and to the discussion of our findings held with

M. Manry at the conclusion of the inspection.

Areac examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and shov1d be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

[. . C.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

(See Page 2)

<

80071000d

'

'

.

Cl

.

._

_.

,

,

_ . . _

-

-

-

.

.

MAY 2 91980

e

r-

Georgia Power Company

-2-

Enclosures:

Inspection Report Nos. 50-321/80-22

.

and 50-366/80-22

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

  • -

l

s

i