Monthly Operating Rept for June 1980
ML19320B054
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/03/1980
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19320B053 List:
References
NUDOCS 8007090195
Download: ML19320B054 (14)


Text

.- __ _ _ _ -

G OPERATING DATA REPORT DOCKET NO. An_ttt DATE TAFNPP COMPLETED IlY r 7nen1t TELEPilONE r3151342-3840 OPERATING STATUS

1. Unit Name: Fit 2 Patrick b"I'5
2. Reporting Period: 800601 - 800630
3. Licensed Thermal Power (MWt): 2436
4. Namepl 'e Rating (Gross MWe): R83
5. Design Electrical Hating (Net MWe): 821
6. Maximum Dependable Capacity (Grou MWe): 830
7. Maximum Dependable Capacity (Net MWe): 800 _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

, NONE _

9. Power Level To Which Restricted,if Any (Net MWe): NONE
10. Reasons For Restrictions,if Any:

This Month Yr. to-Date Cumulatisc

11. Ilours In Reporting Perio,3 720 4367 43200
12. Number Of!!ours Reactor Was Critical 0 2936.1 20566.3
13. Reactor Reserve Shutdown llours 0 _ 0 0
14. Ilours Generator On-Line' 0 _ 2893 28631__,
15. Unit Reserve Shutdown Ilours e p 9
16. Gross t hermal Energy Generated (MWil) n 5862024 57050218
17. Gross Electrical Energy Generated (MWil) 0 2019020 19372720 _
18. Net Electrical Energy Generated (MWil) 0 1953370 18743945
19. Unit Service Factor 0 66.2% 66.3*6
20. Unit Availability Factor 0 66.2% 66.396
21. Unit Capacity Factor (Using MDC Net) 0 55.9% 59.3%
22. Unit Capacity Factor (Using DER Nel) 0 54.5% 52.8%
23. Unit Forced Ou; age Rate 0 5.4% 1 9.796
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

NONE

25. If Shut Dowiy At End Of Report Period, Estimated Da:e of Startup: M T n .Tlli Y - 1980
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION m., 8()Iy B

~ ,

AVERAGE DAll.Y UNIT POWER LEVEL

~.

DOCKET NO. 50-333 UNIT JAFNPP DATE .11TI.Y 1980

. CO.\tPLETED BY E. ZUFELT TELElilONE (3151342-3840

.s MONTH JUNE 1980

. DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) . IMWe-Net I l' 0 g7 0 2 'n 48 n 3 0 19 0 4 0 20 0 5 h ~ 21 n 6 0 22 ~n 7 0 23 n 8 -

0 24 0 9 0 25 n 10 0 26 n *

. 11 0 27 n 12 0 23- n ' t-13 0 29 n 14 0 30 o

-15 n 33

-16 n

. SUhBIARY : THIRD REFUELING AND MAINTENANCE OUTAGE CONTINUED THROUGH Tile

= REPORTING PERIOD.

9' 6

. - - I

+

r.

U UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 m UNIT NAME T m DD DATE P'ry 1999 COMPLETED BY r  :'m3, -

REPORT MONTil JUNE 1980 TELEPilONE ry!5)y? 337n

e. s Nu. Date

, .! E 3:; ) .Y ji5 Licensee Event

,E e ,

u '2 e,

c. 3 Cause & Corrective Action to R-

$E $ jdg a Repori

  • N0 ,

O Pievent Recurrence

.5 14 800S07 3 720 C 4 NA NA NA REFUELING OUTAGE (CUMULATIVE liCURS TO DATE 1308)

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regularory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examination F-Admiaist rative 5 G-Operational Error (Explain) Exhibit I - Same Source Il Other (Explain)

l

.41' > 1 POWER AUPHORITY OF THE STATE OF NEN YORK

. JAMES A. FITZPATRICK NUCLEAR POWER PIAYf NARRATIVE SibEARY OF OPERATING EXPERIENCE JUNE 1980

~ The refueling'and maintenance outage which began on May 7, 1980, continued throughout this reporting period. Major areas include torus modifications,. reactor vessel ISI, eddy current testing, IIRP testing and fire protection modifications.

6 i

e

\

  • O

/

4 3

1

, s

+(

h .. ' ._

e . . .

j POWER AUTHORITY OF THE STATE OF NEW YORK f JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

l'

}.

MAINTENANCE

SUMMARY

[

i- JUNE 1980 I & C WORK REQUEST # CAUSE OF RESULTS OF R PAIR f DATE SYSTEM COMPONENT #

HOW DETECTED MALFUNCTION MALFUNCTION hTl RECURRENCE HOURS 6847 Instruments 6/28/80 01-125 DPT-100A/B OPS: Drift ,. Do Not Agree Calibrated 13.0 7083 6/18/80 03 38-39 IND OPS Broken Prong Will Not Work Replaced Light 2.0 i 7F '9 Normal 6/12/80 07 TIP Penetrations I&C N/A N/A Maintenance 52.0 7065 Cleaned j 6/03/80 07 IRM C OPS Dirty Connector Erratic Connector 8.0 3030 Failed Replaced 4

6/17/80 07 IRM H OPS Bad Detector Downscale Detector 12.0 6973 Repair / Clean 6/17/80 07 Connectors I&C N/A N/A Used Connectors 4.0 7099 Does Not Go Performed l 6/17/80 07 "A" IRM OPS Unknown Full Scale IMP 7.3 Step SA 4.0 6951 Panel Vibration Pointer Replaced Point-i 6/05/80 13 13-SPI OPS Due To Cutting Fell Off er Calibrated 3.0 6908 In rre t Calibrated /

5/30/80 17 17-RR-152 OPS Drift- Indication Cleaned 6.0 6958 Broken Replaced String I

h 6/02/80 17 17-RR-45 8 OPS Drive String No Response Calibrated 2:0 7060 Timer Set Adjus ted PNL 8 i! 6/19/80 76 2 -

OPS Unknown Incorrect Timer 10.0 ,

j 6974 Defective Replaced

6/06/80 93 93-TS-3D I&C Switch 2R-80-111 Switch 8.0

POWER AUTHORITY OF THE STATE OF NEW YORK T JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

JUNE 1980 I & C-WORK' REQUEST # CAUSE OF RESULTS OF Tl N K R PAIR DATE SYSTEM HOW DETECTED COYPONENT # MALFUNCTION MALFUNCTION RECURRENCE- HOURS 7257 Incorrect -

6/12/80 93 93-TS-1B OPS i Drift - - Alarm Re-calibrated 8.0-l . 5284 Incorrect i6/17/80 93 93-TS-5C OPS Drift Setpoine Calibaared_,. 10 0

!. 6972 out Of I6/17/80 93 93-TI-2C i&C Drift Tolerance Replaced 4O j 752 Erratic-On

6/28/80 93 93-AM-A I&C N/A Calibration Replaced 1.0 1365 'Irratic On

!6/28/80 93 93-AM-B- I&C N/A Calibration Replaced 2.0 i

I i

9

  • e t

'F

POWER AUTHORITY OF THE STATE OF NEW YORK C JAVES A. FITZPATRICK NUCLEAR POWER PLANT .

l SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

! DATE SYSTEM 0 ES

, HOW DETECTED CAUSE OF, MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 21 May 10 3730 Visual NRC Bulletin 79-02 Modified H10-148 79 H10-148 Inspection --

23-May 10 3807 Visual NRC Bulletin 79-02 Repaired H10-243 123 1/2 H10-243 Inspection 26 May 10 5143 Visual NRC Bulletin 79-02 Repaired H10-170 184 H10-170 Inspection 12 May 19 5186 Visual NRC Bulletin 79-02 Repaired H19-59 79 H19-59 Inspection 23 May 10 2043 Visual NRC Bulletin 79-02 Modified H10-500 175 H10-500 Inspection 23 May 10 3774 Visual NRC Bulletin 79-02 Repaired H10-51CN 189 1/2 H10-51CN Inspection i

23 May 10 3779 Visual NRC Bulletin 79-02 Modified H10-487 279 H10-487 Inspection 26 May 70 ____ 5 2 0 5 Visual NRC Bulletin 79-02 Repaired BFSK-405 140 1/4 BFSK-405 Inspection j '

POWER AUTHORITY OF THE STATE OF NEW YORK

& . JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

DATE O

SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ET 26 May 14 5219 Visual Torus Modification Repaired H14-41 68 H14-41 .

/-

26 May 14 5220 Visual Torus Modification Repaired H14-55 37 H L4- 55 28 May 71 4904 N/A None Electrical Switchgear, Breakers 80 BUS 10600 and Loads Preventative Mainte-nance 22 May 10 5164 Visual NRC Bulletin 79-02 Repaired H10-252 459 H10-252 Inspection 1 June 101 1907 N/A None Manufactured Washers as 765 1/2 Manufacture Necessary Washers

? June 101 3749 Analysis Pipe Stress Analysis Modified Baseplates 334 1/4 H10-481 & per NRC Bulletin 79-07 482 2 June 100 5163 Visual NRC Bulletin 79-02 Modified H76-52 H76-52 Inspection 68 1/2 2 June 100 5174 Visual NRC Bulletin 79-02 Modified Hanger B 149 1/2 Hanger B Inspection ,

i (RHR)

POWER- AUTHORITY OF THE STATE OF NEW YORK i T -

JAMES A. FITZPATRICK NUCLEAR POWER. PLANT  ;

-SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM 0E

, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE. T 5 June 08 7092 Visual Cable on Refuel Bridge ' Replaced Cable and Rearranged 8 Refuel Mast Pulled Out of - Cable to Prevent Recurrence Bridge Conduit 7 June 08 7098 OPS Refuel Grapple Prox- Replaced Switches 10 Refuel imity Switches Damaged Grapple During Refueling 3 June 100. 5200 Visual NRC Bulletin 79-02 Modified H10-112 259 1/2 H10-ll2 Inspection

^

3 June 100 5189 Visual NRC Bulletin 79-02 Modified H23-61 322 1/2 H23-61 Inspection 4 June 101 3743 Analysis Pipe Stress Analysis Modified H10-10 107 1/2 H10-10 per NRC Bulletin 79-07 5 June 100 , 5199 Visual NRC Bulletin 79-02 Modified H46-269 441 H46-269 Inspection 5 June 100 5208 Visual NRC Bulletin 79-02 Modified H14-67 32 H14-67 Inspection 5 June 100 5203 Visual NRC Bulletin 79-02 Modified H10-114 211 1/2 H10-ll4 Inspection 5 June 100 5202 Visual NRC Bulletin 79-02 Modified H10-254 181 H10-254 Inspection

POWER AUTHORITY OF THE STATE OF NEW YORK C

JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM V. O EST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE. RECURRENCE T 5 June 100 5217 Visual NRC Bulletin 79-02 Repaired PFSK 956 10 PFSK 956 In'spection -'-

\

9 June 100 5212 Visual NRC Bulletin 79-02 Modified H15-104 182 1/2 H15-104 Inspection 10 Jun 100 5207 Visual NRC Bulletin 79-02 Modified BFSK-659-H7 225 3/4 BFSK-659-H7 Inspection L1 Jun 10 5613 Visual Worn Seat Repaired Valve Seat 346 1/2 10-MOV-57 L3 Jun 27 6597 LLRT Seat Leak Repaired A0V-114 188 A0V-ll4 L3 Jun 71 4909 N/A None Electrical Preventative 24 BUS 12600 Maintenance L4 Jun 10 6814 N/A None Preventative Maintenance 16 MOV-26B L3 Jun 10 5213 Visual NRC Bulletin 79-02 Modified H10-465 247 1/2 H10-465 Inspection t.

L3 Jun 10 5228 Visual NRC Bulletin 79-02 Modified H10-220 13 ,

H10-220 Inspection ,

r . . _

p POWER AUTHORITY OF THE STATE OF NEW YORK  ;

7 JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

I-i SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

.l.

V. O EST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

, 14 Jun 15 5235 Visual NRC Bulletin 79 Modified H15-135 97 H15-135 Inspection i

?

17 Jun 10 5216 Visual NRC Bulletin 79-02 Modified H10-262 30 1/2-H10-262 Inspection 17 Jun 10 5218 Visual NRC Bulletin 79-02 Inspected H10-535 6 H10-535 Inspection 17 Jun 01-125 5232 Visual NRC Bulletin 79-02 Modified BFSK 294 150 3/4 BFSK 294 Inspection 17 Jun 01-125 5231 Visual 'NRC Bulletin 79-02 Modified BFSK 295 120 3/4 BFSK 295 Inspection

17 Jun 76 5224 Visual NR'C Bulletin 79-02 Modified H76-38 320 3/4 i

H76-38 In'spection 17 Jun 23 5221 Visual NRC Bulletin 79'-02 Modified H23-39 115 H23-39 Inspection I

fi .

, 9 June 10 2352 N/A None Preventative Maintenance 70

~

P-1A f

l' June 29 6585 LLRT Worn Seat & Disc Machined Seat, Replaced Disc 540 I A0V 86D_ Testing .

y

POWER AUTHORITY OF THE STATE OF NEW YORK 3' -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM O EST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 7 Jun 29 6953 LLRT Worn Seat & Disc Machined Seat, Lapped 400 d 80D XOV Testing '-

10 Jur 02 7253 Visual Improper Handling Replaced Upper Tie Plate 40 Fuel Bundle LJM 544 12 Jur 29 5511 Surveillance Dirty Silencer Replaced Silencer 6

, A0V 80A Testing 9 June 93 4964 N/A None Preventative 420 EDG B & D 9 June 93 4875 Operational Open Heater Winding Replaced Heater 10 EDG D 18 Jun 76 4458 N/A None Preventative Maintenance 96 P-1 18 Jun 10 6247 N/A None Preventative Maintenance 16 MOV-65B 18 Jun 13 7265 Maintenance Broken Gear Teeth in Replaced Limit Switch Assembly 22 -

, MOV-15 Valve Operator Geared Repacked With High Temperature Limit Switch. Grease.

e h

n POWER AUTHORITY OF THE STATE OF NEW YORK- l JAMES A. FITZPATRICK NUCLEAR POWER -PLANT ~;

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM OET T HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 18 Jur 15 5134 Visua. NRC Bulletin 79-02 Modified H15-14 347 PFSK_895 Irispection --

(H15-14) 17 Jur 13 4670 Visual Packing Leak Repacked 13 MOV-15 108 1/2 MOV-15 18 Jur 39 6820 Visual Seat Leak Repaired IAS22 41 IAS22 19 Jun 33 4699 N/A None Preventative Maintenance 357 1/2 TK 12A&B Cleaned Tanks 19 Jun 10 5211 Visual NRC Bulletin 79-02 Modified H10t.-47 290 1/2 H10A-47 Inspection 19 Jun 76 5242 Visual NRC Bulletin 79-02 Modified BFSK 569 H9 73 1/2 BFSK 569 H9 Inspection 23 Jun 46 6822 LLRT Scat Leak Replaced Disc 38 1/2 46 ESW 16B 25 Jun 27 2557 Audio Vibration Tightened Fitting 1 27 AOV 114 9

I

POWER AUTHORITY OF THE STATE OF NEW YORK t

JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM RE0UEST#

, HOW OETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 19 Jur 93- 7284 Visual Wear Replaced Pump 4 FPP 2D J 18 Jur 46 8809 Operational Wear Replaced Seat 26 ESW 3A & B Repositioned Shaft in Handle 16 Jut 27 4815 N/A N/A Manufactured Travel Stops 35 Various 14 Jur 20 7275 Audio Failed Seal Replaced Air Solenoid 16 AOV 83 4

I g

4 e

I ,

L. --