ML19320B044
| ML19320B044 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/21/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML19320B045 | List: |
| References | |
| NUDOCS 8007090176 | |
| Download: ML19320B044 (2) | |
See also: IR 05000440/1980006
Text
e
f "%'o
UNITED STATES
c8\\
'}s
NUCLEAR REGULATORY COMMISSION
g 'k > .,.,
.. #
3
'
'
r
REGION ill
.,'
o,f\\h
8
'
k
7M ROOSEVELT ROAD
g
,o
GLEN ELLYN,lLLINOIS 60137
.....
IMAY 21 G80' -
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN:
Mr. Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the inspection conducted by Messrs. J. Hughes and R. Landsman
of this office on April 21-24, 1980, of activities at the Perry Nuclear Plant
Project, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148
and No. CPPR-149 and to the discussion of our findings with Mr. M. Edelman
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in tbe enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Cole of Federal Regula-
tions.
Section 2.201 requires you to submit to this office within thirty
days of your receipt of this notice a writcen statement or explanation in
reply, including for each item of noncompliance:
(1) corrective action
taken and the results achieved; (2) corrective action to be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the ap-
>
plication is contained in an enclosure to the application.
I
i
i
8007090/7(o
6
'
-
-
-
-.
.
The Cleveland Electric
2-
-
Illuminating Company
MAY 21 S60'
We will gladly tiscuss any questions you have concerning this
inspection.
Sincerely,
Ana-
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1. -Appendix A, Notice of
Violation
2.
IE Inspection Reports
No. 50-440/80-06 and
No. 50-441/80-06
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Power Siting
Commission
Mr. Daniel D. Wilt, Attorney
.
Helen W. Evans, State of Ohio
,
$
.
9
-,
, _ ,
-
-