Forwards IE Insp Repts 50-440/80-06 & 50-441/80-06 on 800421-24 & Notice of Violation
ML19320B044
Person / Time
Site: Perry  
Issue date: 05/21/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19320B045 List:
References
NUDOCS 8007090176
Download: ML19320B044 (2)


See also: IR 05000440/1980006

Text

e

f "%'o

TIC

UNITED STATES

c8\\

'}s

NUCLEAR REGULATORY COMMISSION

g 'k > .,.,

.. #

3

'

'

r

REGION ill

.,'

o,f\\h

8

'

k

7M ROOSEVELT ROAD

g

,o

GLEN ELLYN,lLLINOIS 60137

.....

IMAY 21 G80' -

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN:

Mr. Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Messrs. J. Hughes and R. Landsman

of this office on April 21-24, 1980, of activities at the Perry Nuclear Plant

Project, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148

and No. CPPR-149 and to the discussion of our findings with Mr. M. Edelman

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in tbe enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Cole of Federal Regula-

tions.

Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a writcen statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the ap-

>

plication is contained in an enclosure to the application.

I

i

i

8007090/7(o

6

'

-

-

-

-.

.

The Cleveland Electric

2-

-

Illuminating Company

MAY 21 S60'

We will gladly tiscuss any questions you have concerning this

inspection.

Sincerely,

Ana-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. -Appendix A, Notice of

Violation

2.

IE Inspection Reports

No. 50-440/80-06 and

No. 50-441/80-06

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power Siting

Commission

Mr. Daniel D. Wilt, Attorney

.

Helen W. Evans, State of Ohio

,

$

.

9

-,

, _ ,

-

-