Tennessee Valley Authority Sequoyah Nuclear Plant SPECIAL REPORT 80-1 '

Technical Specification Involved: 3.7.12 Reported Under Technical Specification 6.9.2 Date of Occurrence: 6/5/80 Time of Occurrence: 1200 EDT Unit 1 t

Description of Occurrence Firestop penetration MK121 was opened on May 27, 1980, for piping configuration inspection. Excessive clearance was initially reported for the support in the penetration. The 7-day time requirement for i firestop penetration was exceeded while waiting for resolution of the problem. The penetration was closed on June 6, after remeasurements indicated that the clearances were within tolerance.