Ack Receipt of 800506 Final Deficiency Rept Re Bunker Ramo Corp Electrical Penetration Assemblies
ML19320A571
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/06/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
References
NUDOCS 8006250403
Download: ML19320A571 (1)


Text

Ib i

4

. # are UNITED STATES 1

I

/

e NUCLEAR REGULATORY COMMISSION y

REGION I E

f

$31 PARK AVENUE j

4 KING OF PRUSSI A, PENNSYt.VANI A 19406 4

Je g 0 6 1980 Docket Nos. 50-482 50-483 4

50-486 SNUPPS ATTN: Mr. Nicholas A. Petrick Executive Director 5 Choke Cherry Road Rockville, Maryland 20850 Gentlemen:

Subject:

" Bunker Ramo Corporation Electrical Penetration Assemblies j

(Your letter SLNRC 80-22 of May 6, 1980)

Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your report will be reviewed and evaluated, and should we require additional infonnation concerning this matter, we will contact you.

Your cooperation with us is appreciated.

Sincerely.

n-Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch cc:

J. E. Arthur, Chief Engineer, RG&E C. R. Anderson, M(nager, QA, RG&E Lex K. Larson, Esquire Gerald Charnoff, Esquire 8006250 MO3 8

1

+--v..--

-_y

_ m

,m_,m-y w

. u __...

.c SNUPPS i

- messer unit Pouser Mont System 5 choke cherry need Nicholas A. Petrick RocknHe, Marytend 20850 Executive Director (301) 8884010 i

May 6, 1980 SLNRC 80- 22 FILE: 0491.10.2/E-035 SUBJ:

Bunker Ramo Corporation Electrical Penetration Assemblies: SNUPPS Units 1 (Wolf Creek) and 2 (Callaway)

Mr. Boyce Grier Director, Region 1 Office of Inspection and Enforcement i

U.S. Nuclear Regulatory Commission 631 Park Avenue l

King of Prussia, Pennsylvania 19406 Ref:

STN'50-482 STN 50-483 STN 50-586

Dear Mr. Grier:

On February 26, 1980, the NRC resident inspectcr at Callaway Site was informed by Union Electric of deficiencies in electrical penetration assemblies furnished by dunker Ramo Corporation to the Callaway site.

Further investigation indicated these defi~ciencies to be generic in nature and were subsequently reported to Region I on March 24,198f via telecon between McGaughey, NRC and Seiken, SNUPPS.

It was further indicated that this matter would be described in a generic Significant Deficiency Report to be issued by April 30, 1980 by SNUPPS applicable to all SNUPPS units.

A further extension to May 7th was requested of and agreed to by Mr. McGaughey on April 30th.

Enclosed with this letter is a report of the defective penetration assemblies.

This report provides a chronology of events associated l

with discovery of the described deficiencies; summarizes safety impli-cations associated therewith and outlines a plan of follow-up correc-tive actions initiated and/or planned.

This plan will provide for test verification of all questionable or suspect penetration wiring sufficient to assure performance acceptability.

l

@ u. 2r d 80 0 6 /D C 6

SLNRC 80-22

  • Page Two It should be noted that the enclosed report is being treated as a final submittal under 10CFR50.55(e) definitions.

The corrective action plan outlined in the enclosure will be monitored by Callaway and Wolf Creek site QA personnel.

In the event additional actions are required or should complications result in the implementation phases, a supplemen-tal report will be prepared and forwarded to NRC.

In the interim, fur-ther questions may be addressed to Mr. S. J. Seiken, SNUPPS QA Manager at (301) 869-8010.

Veryhtr 1

yours, h-E.4(\\c Nicholas A. Petric SJS/bds/la27 cc:

Mr. J. A. Keppler, Director, Region III, USNRC Mr. Karl Seyfrit, Director, Region IV, USNRC Mr. Victor Stello, Jr., Director, Office of Inspection and Enforcement, USNRC, Washington, D.C.

Document Management Branch, USNRC, Washington, D.C.

Enclosure:

Report on Improperly Crimped Lugs on Electric Penetration Assembiies l

REPORT ON IMPROPERLY CRIMPED LUGS ON ELECTRICAL PENETRATION ASSE.mJLIES SUPPLIED BY BUNKER RAMO CORPORATION FOR CALLAWAY PLANT UNIT NO. 1 (UNION ELECTRIC)

AND WOLF CREEK (KANSAS GAS AND ELECTRIC CO.)

i 1

l i

i 1

($f??%E%lll&Ihl!$hlfl$??A,Y{'{N$$E(f

..g-

\\

1 DUPLICATE DOCUMENT

( gon l

l id l

Entire document previously I

entered into s t

under:

foo

/ 09_,3 xNO r

No. of pages:

\\

~

.n q

m.

.-.