Text
'
UNITED STATES acoq
[
Jh NUCLEAR REGULATORY COMMISSION
[
S REGION I 3
[
631 PAR A AVENUE n:NQ OF PRUSSI A PENNSYLVANI A 19406
+.... #g w
Docket Nos. 50-482 50-483 50-486 SNUPPS ATTN: Mr. Nicholas A. Petrick Executive Director 5 Choke Cherry Road Rockville, Maryland 20850 Gentlemen:
Subject:
Ruskin Manufacturing Co. Fire Dampers (Your letter SLNRC 80-24 of.iay16,1980)
Thank you for your letter, referenced above, which forwarded a final report pursuant to 10 CFR 50.55(e) regarding the subject matter.
Your report will be reviewed and evaluated, and should we require additional information concerning this matter, we will contact you.
Your cooperation with us is appreciated.
Sincerely, 1
~
m._
- _iY, l Robert T. Carlson, Chief
?'
.j Reactor Construction and Engineering Support Branch T
cc:
J. E. Arthur, Chief Engineer, RG&E C. R. Anderson, Manager, QA, RG&E Lex K. Larson, Fsquire Gerald Charnoff, Esquire 1
8006250 Sft/
3NUPPS Stendenhead heiser Unit Pouser Mont Systeen 5 choke chen need Nicholas A. Petrick w
20s50 Executive Director May 16, 1980 SLNRC 80-24 FILE: 0491.10.2/M-627B SUBJ: Ruskin Manufacturing Co. Fire Dampers: SNUPPS Units 1 (Wolf Creek) and 2 (Callaway 1)
Mr. Boyce Grier Director, Region I Office of Inspection and Enforcement.
U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Re:
STN 50-482 STN 50-483 STN 50-486 Ref: a) SLNRC 80-8 dated 2/15/80: Subject as Above b) SLNRC 80-16 dated 4/3/80:
t,
Dear-Mr. Grier:
j The Ref. a) letter forwarded to the NRC per 10CFR50.55(e) regulations, a report concerning deficiencies in the vertical fire danpers furnished by Ruskin Manufacturing Co. to the Callaway and Wolf Creek jobsites.
The Ref. b) follow-up letter indicated that, as a result of continuing inves-tigations, additional problems had been identified in the Ruskin dampers requiring further design modification and qualification testing.
The additional problems experienced since the initial Ref. a) report are described in a supplemental 10CFR50.55(e) report, enclosed herewith.
This supplement describes modifications established and implemented by Ruskin Manufacturing Co. and which ultimately will be qualified on the basis of performance tests prior to and during site installation.
A follow-up program to ensure proper implementation of these modifications has since been established at each SNUPPS jobsite and will be monitored by cognizant site personnel.
The attached supplement is being treated as a final report under current 10CFR50.55(e) definition.
In the event additional actions are found to C
e 0
0
l SLNRC 80-24 May 16,1980 Page Two be necesrary to fully resolve this matter, these will be communicated to the NRC.-
In the interim, further questions can be addressed to Mr. S. J.
Seiken, SNUPPS QA Macager, at (301) 869-8010.
Very truly yours, W \\c Nicholas A. Petric SJS:dck/A7
Attachment:
Supplement to the Final Report on Vertical Fire Dampers cc: Mr. J.A. Keppler, Director, Region III, USNRC Mr. Karl Seyfrit, Of rector, Region IV, USNRC Mr. Victor Stello, Jr., Director, Office of Inspection and Enforcement, USNRC, Washington, D.C.
Document Management Branch, USNRC, Washington,.0.C.
t
Supplement To The Final Report On.
Vertical Fire Dampers S'upplied By Ruskin Manufacturing Company n
For The SNUPPS Project i